Pages without language links

Jump to navigation Jump to search

The following pages do not link to other language versions.

Showing below up to 100 results in range #1 to #100.

View (previous 100 | ) (20 | 50 | 100 | 250 | 500)

  1. CO:additionalName
  2. CO:additionalName alternative
  3. CO:additionalName approvedBy
  4. CO:additionalName checkedBy
  5. CO:additionalName concessionaire
  6. CO:additionalName contractor
  7. CO:additionalName customer
  8. CO:additionalName infrastructureManager
  9. CO:additionalName operationalUndertaking
  10. CO:additionalName phase
  11. CO:additionalName project
  12. CO:additionalName railwayUndertaking
  13. CO:additionalName revisedBy
  14. CO:additionalName revision
  15. CO:additionalName vehicleManufacturer
  16. CO:additionalName vehicleOperator
  17. CO:additionalName vehicleOwner
  18. CO:alternative
  19. CO:approvedBy
  20. CO:checkedBy
  21. CO:concessionaire
  22. CO:contractor
  23. CO:customer
  24. CO:dc:contributor
  25. CO:dc:coverage
  26. CO:dc:creator
  27. CO:dc:date
  28. CO:dc:description
  29. CO:dc:format
  30. CO:dc:identifier
  31. CO:dc:language
  32. CO:dc:publisher
  33. CO:dc:relation
  34. CO:dc:rights
  35. CO:dc:source
  36. CO:dc:subject
  37. CO:dc:title
  38. CO:dc:type
  39. CO:designator
  40. CO:infrastructureManager
  41. CO:metadata
  42. CO:name
  43. CO:name trainProtectionSystem trainProtectionSystemsOnVehicle
  44. CO:objectRevised
  45. CO:objectsRevised
  46. CO:operationalUndertaking
  47. CO:organizationalUnits
  48. CO:organizationalUnits/mappingERA
  49. CO:phase
  50. CO:project
  51. CO:projectArea
  52. CO:projects
  53. CO:railwayUndertaking
  54. CO:revisedBy
  55. CO:revision
  56. CO:trainProtectionSystem
  57. CO:trainProtectionSystem trainProtectionSystemsOnVehicle
  58. CO:trainProtectionSystemsOnVehicle
  59. CO:validFor
  60. CO:validFor trainProtectionSystem trainProtectionSystemsOnVehicle
  61. CO:vehicleManufacturer
  62. CO:vehicleOperator
  63. CO:vehicleOwner
  64. CO:vehicleSystem
  65. Dev:Border between infrastructure managers and countries
  66. Dev:Clearance gauge
  67. Dev:Coding XML Components
  68. Dev:CommonDataTypes
  69. Dev:Connection between tracks
  70. Dev:Creating instructions
  71. Dev:Defaults
  72. Dev:Defining temporal availability of infrastructure elements and speed profiles
  73. Dev:Double-track line
  74. Dev:Examples for a non-zero operating day offset at the first ocpTT of a train run
  75. Dev:Guides/auto
  76. Dev:How To Reference Infrastructure
  77. Dev:How to define track usage of a train in stations
  78. Dev:Intermodal terminal
  79. Dev:Intersection of lines of different categories
  80. Dev:Maintenance facility
  81. Dev:Midnight overrun
  82. Dev:Multiplicity
  83. Dev:Passenger station
  84. Dev:Railway station ownership
  85. Dev:Refueling facility
  86. Dev:Sic
  87. Dev:Storage siding
  88. Dev:Syntactic Guidelines
  89. Dev:Tracks within and between the station
  90. Dev:Train Coupling And Sharing
  91. Dev:Types of ocps
  92. Dev:Units
  93. Dev:Usage of the track between the stations
  94. Dev:XMLtree/2.3
  95. Dev:attributeSyntax
  96. Dev:categoryUsage
  97. Dev:changes/2.1
  98. Dev:changes/2.1/diff
  99. Dev:changes/2.2
  100. Dev:changes/2.2/diff

View (previous 100 | ) (20 | 50 | 100 | 250 | 500)