Template:Table/Dev:Semantic Constraints

From railML 2 Wiki
Revision as of 14:17, 3 July 2023 by RailML Coord Documentation (talk | contribs) (Erweiterung um Beschreibungsspalte)
Jump to navigation Jump to search

Return to article

Element ID Proposal date Date of acception Date of deprecation Description
<TT:timetablePeriod> TT:001 2018-11-12 2019-03-21
<TT:operatingPeriodRef>><TT:specialService> TT:001 2018-11-12 2019-03-21
<TT:operatingPeriod>><TT:specialService> TT:001 2018-11-12 2019-03-21
<TT:operatingPeriodRef> TT:001 2018-11-12 2019-03-21
<TT:operatingPeriod> TT:001 2018-11-12 2019-03-21
<TT:operatingDay> TT:001 2018-11-12 2019-03-21
<RS:state> TT:001 2018-11-12 2019-03-21
<TT:ocpTT> (first semantic constraint) TT:002 2018-10-25 2019-06-20
<TT:ocpTT> (second semantic constraint) 2018-10-25 discarded
<TT:circulation> TT:001 2018-11-12 2019-03-21
<TT:blockPart> (first semantic constraint) TT:001 2018-11-12 2019-03-21
<TT:blockPart> (second semantic constraint) TT:003 2019-07-13
<TT:blockPart> (third semantic constraint) TT:004 2019-07-20
<RS:operator> TT:001 2018-11-12 2019-03-21
<RS:owner> (introduced with version 2.5) TT:001 2018-11-12 2019-03-21
<IS:state> TT:001 2018-11-12 2019-03-21
<IS:state (with length)> TT:001 2018-11-12 2019-03-21
<IS:designator> TT:001 2018-11-12 2019-03-21
<CO:phase> (introduced with version 2.5) TT:001 2018-11-12 2019-03-21
<IS:speedChange> (first semantic constraint) IS:001 2019-04-11 discarded
<IS:speedChange> (second semantic constraint) IS:011 2022-03-14
<TT:rostering> TT:005 2019-05-22 2019-06-25
<TT:stopDescription> (first semantic constraint) TT:006 2018-09-03 2019-06-20
<TT:stopDescription> (Stop on request / More than one stop type per OCP) TT:007 2019-06-19 discarded 2020-04-23
<TT:trackInfo> (first semantic constraint) TT:008 2018-08-21 2019-06-20
<TT:trackInfo> (second semantic constraint) TT:009 2018-08-21 2019-06-20
<TT:times> (Correct encoding of run time supplements) TT:010 2019-06-19 2020-10-15
<TT:times> TT:011 2019-06-19
<TT:times> TT:012 2019-06-19 2022-06-02
<TT:times> TT:013 2019-06-19
<TT:times> (Arrival times for passing OCP's) TT:014 2019-06-19 2022-06-02
<TT:times> (Arrival time at first OCP) TT:015 2019-06-19 2022-06-02
<TT:times> (Departure time at last OCP) TT:016 2020-10-09 2022-06-02
<TT:connection> TT:017 2022-12-15 2022-12-15
<IS:trackEnd> IS:002 2019-06-17
<IS:trackBegin> IS:003 2019-06-17
<IS:track> IS:004 2019-06-17
<IS:ocp> IS:005 2019-06-19
<IS:mileageChange> IS:006 2019-06-19
<IS:propOperational> IS:007 2020-02-25 discarded
<IS:uptime> IS:008 2020-02-28
<IS:uptime> IS:009 2020-02-28
<IS:uptime> IS:010 2020-02-28
<IS:speedProfile> (first semantic constraint) IS:012 2022-03-14
<IS:speedProfile> (second semantic constraint) IS:013 2022-03-14
<IS:tunnel> IS:014 2022-03-14
<IS:ocp> IS:015 2022-07-14