Search results
Jump to navigation
Jump to search
- bound systems and train bound systems respectively: <trainProtectionSystemsAtTrack>: Container for train protection systems, installed "at the track" <tra10 bytes (797 words) - 12:25, 24 January 2020
- must reference one or more <trainPart>s, that all <trackElements> must have a position on the <track>, that the length of a <tunnel> is a decimal number10 bytes (579 words) - 15:58, 18 May 2020
- Dev:TrainProtectionSystems (section At track)<validFor> <trackSystem>LZB</trackSystem> <trackSystem>CIR-ELKE</trackSystem> <trackSystem>CIR-ELKE2</trackSystem> </validFor> </trainProtectionSystem> railML®10 bytes (422 words) - 21:38, 23 January 2020
- use case can be defined as a single task, performed by the end user of a system, that has some useful outcome*. It is described as a list of steps (actions10 bytes (287 words) - 16:31, 3 February 2020
- Dev:XMLtree (redirect from CO:XMLtree)event, informationAreaRef <originalTrackInfo> trackInfo, trackRef <trackInfo> operatingPeriodRef, platform, track <organizationalUnitBinding> <vehicleOperator>112 KB (4,754 words) - 14:59, 10 June 2024
- Dev:changes/2.3/diff (redirect from CO:changes/2.3/diff)<name /> - <validFor> - <trackSystem>LZB</trackSystem> - <trackSystem>CIR-ELKE</trackSystem> - <trackSystem>CIR-ELKE2</trackSystem> - </validFor> - </trainProtectionSystem>108 KB (9,484 words) - 10:56, 8 October 2021
- Dev:Registers (redirect from CO:Codelist:Registers)any type of <functionalInfrastructure> element, e.g. <operationalPoint>, <track>, <balise>, etc. Further, the designator is available for topology element10 bytes (721 words) - 21:27, 23 January 2020
- Parent: <trainProtectionSystem> Children: <vehicleSystem> [1..1] If the code for the system differs between vehicle and track installation, put the mapping383 bytes (46 words) - 20:32, 15 February 2018
- Dev:InfrastructureManagers (redirect from CO:Codelist:InfrastructureManagers)UIC IRS/leaflet 920-1:2006 (also called RICS or Railway Interchange Coding System (external link)). For instance, the entry for ÖBB Infra looks like this:10 bytes (299 words) - 21:23, 23 January 2020
- Main Page (section Common (CO))or 3-dimensional coordinate system, e.g. the WGS84 that is widely used by today's navigation software. Geometry. The track geometry can be described in9 KB (916 words) - 12:29, 22 February 2024
- Dev:changes/2.2/diff (redirect from CO:changes/2.2/diff)<name /> + <validFor> + <trackSystem>LZB</trackSystem> + <trackSystem>CIR-ELKE</trackSystem> + <trackSystem>CIR-ELKE2</trackSystem> + </validFor> + </trainProtectionSystem>331 KB (27,016 words) - 10:56, 8 October 2021
- Dev:changes/2.4 (redirect from CO:changes/2.4) (section <track>@type: value stationTrack deprecated)commercial="true"> <trackInfo operatingPeriodRef="op_Monday-Friday" track="Track 4" /> <trackInfo operatingPeriodRef="op_Saturday+Sunday_in_Winter" track="Track 7" platform="7A"23 KB (104 words) - 11:10, 3 May 2022
- Concept Dev:TrainProtectionSystems The codelist TrainProtectionSystems comprises of train protection systems CO New users Concept Dev:Coding XML Components How8 KB (25 words) - 18:35, 5 February 2024
- f ocp-blockPartEndKeyref track-ocpKeyref trackKey track-lineKeyref track-locallyControlledAreaKeyref track-ocpTTKeyref track-sectionTTKeyref lineKey l36 KB (103 words) - 13:54, 21 February 2022
- (pneumatic) brake system using compressed air to press the brake shoes onto the wheels or brake discs. "Druckluftbremse" vacuum brake system using vacuum in7 KB (1,239 words) - 17:25, 15 February 2021
- Dev:changes/2.3 (redirect from CO:changes/2.3)to an importing system that can handle cancellations. NOTE: A railML® 2.3 export file will need to be adapted to the importing system - i.e. whether or20 KB (238 words) - 18:57, 22 January 2024
- </xs:complexType> + <!-- Tracks --> + <xs:complexType name="eTracks"> <xs:sequence> <xs:element name="track" type="rail:eTrack" minOccurs="0" maxOccurs="unbounded">398 KB (34,006 words) - 10:54, 8 October 2021
- Dev:changes/2.1/diff (redirect from CO:changes/2.1/diff)- <!-- tracks --> - <!-- +- track --> - <!----> - - <xs:complexType name="eTracks"> - <xs:sequence> - <xs:element name="track" type="rail:eTrack" minOccurs="0"531 KB (37,474 words) - 10:55, 8 October 2021
- Element <trainProtectionSystem>, child of <trainProtectionSystemsAtTrack> Element <trainProtectionSystem>, child of <trainProtectionSystemsOnVehicle>156 bytes (10 words) - 19:18, 15 February 2018
- child of <trainProtectionSystem_trainProtectionSystemsAtTrack> Element <name>, child of <trainProtectionSystem_trainProtectionSystemsOnVehicle>166 bytes (12 words) - 07:33, 15 November 2022