UC:TT:UseCases
Jump to navigation
Jump to search
| |||||||||
| |||||||||
railML® 3 Wiki – RailTopoModel® Wiki |
This page provides use cases specific to the TT-subschema. See Dev:Use cases to learn what is a use case, how to contribute to writing good railML®-Use Cases and where to find them in this wiki.
List of Use Cases
The following list provide links to the use cases related with the exchange of timetable data (TT schema):
- Timetable Information; Fahrplanauskunft; (writer: HaCon (13.03.15); reviewer: IVU)
- Passenger information at stations; Fahrgastinformation am Bahnhof (writer: PSI (20.05.15); reviewer: iRFP)
- A timetable for a competition (call for proposals); Ausschreibungsfahrplan (writer: iRFP (21.05.15); reviewer: IVU)
- Import complete timetable for vehicle working scheduling and vehicle workings; Umlaufbildung Fahrzeuge Jahresfahrplan (writer: IVU (20.05.15); reviewer: iRFP)
- Adopt vehicle working scheduling to timetable changes; Umlauf an Jahresfahrplan anpassen (writer: IVU (21.05.15) ; reviewer: HaCon)
- Exchange of formation data; Austausch von Wagenreihungen/Behängungsdaten (writer: iRFP (21.05.15); reviewer: IVU )
- TAF/TAP TSI requirements; TAF/TAP TSI Anforderungen (writer: ERA; reviewer: ???)
- Operational simulation timetable; Betriebssimulation Fahrplan (writer: PSI; reviewer: SMA)
- Langfristfahrplanerstellung/Infrastruktur (writer: SMA; reviewer: ???)
- Slot ordering; Trassenbestellung (writer: SMA; reviewer: iRFP)
- Automatic Route Setting; Zuglenkung (writer: OTRT; reviewer: PSI)
- Passenger information inside the train; Fahrgastinformation im Zug (writer: Interautomation; reviewer: PSI and iRFP)
- Betriebsleitsysteme/RBL (writer: INIT or Interautomation; reviewer: IVU)
- Dienstbildung Personal Jahresfahrplan (writer: INIT; reviewer: IVU)
- Disposition Fahrzeugeinsatz (writer: ???; reviewer: ???)
- Ergebnis Fahrplansimulation (writer: ???; reviewer: ???)
Glossary
- LTP = long term planning: the yearly timetable(s)
- STP = short term planning: changes to the current production timetable up to the point that changes can be published to downstream systems (passenger information, train control, train operators, etc.)
Use cases, usecase, usescases