Search results
Jump to navigation
Jump to search
- the following information: Topology. The track network is described as a topological node edge model (see <trackTopology>). Coordinates. All railway infrastructure3 KB (350 words) - 19:56, 22 January 2024
- timetable) — e.g. the wiki documentation for <connection> is found here https://wiki2.railml.org/wiki/TT:connection2 KB (260 words) - 21:06, 22 January 2024
- IS:trackBegin (section Position of trackBegin in the XML-Tree / Position von trackBegin im XML-Baum)trackBegin Parent: <trackTopology> Children: (introduced with version 2.2) <geoCoord>, <bufferStop>, <connection>, <openEnd>, <macroscopicNode> [1..1]3 KB (483 words) - 10:48, 15 April 2024
- than or equal to the track's length The end of the track is defined by the "real" length of the track as distance from the trackBegin regardless the "absolute4 KB (545 words) - 18:10, 22 March 2024
- <trackEnd pos="450" id="tr02_te"> <macroscopicNode ocpRef="ocp01"/> </trackEnd> </trackTopology> </track> </tracks> The first track with the internal name9 KB (1,420 words) - 10:23, 1 February 2024
- TT:connection (section Position of connection in the XML-Tree / Position von connection im XML-Baum)opposite track at the arrival platform of the enclosing trainPart are considered connections to the enclosing trainPart --> </connection> <connection connType="commercial"25 KB (3,398 words) - 20:30, 22 January 2024
- . </trackEnd> </trackTopology> </track> <track id="3"> <trackTopology> <trackBegin id="tB3"> <connection id="c31" ref="c13"/> </trackBegin> <trackEnd id="tE3">45 KB (5,550 words) - 18:04, 19 January 2024
- refer to Dev:Connection_between_tracks for further information on how to use switches. Positive pos values describe the distance from the track's begin. The2 KB (1,151 words) - 16:06, 6 November 2022
- IS:connection trackEnd (section Position of connection in the XML-Tree / Position von connection im XML-Baum)connection Parent: <trackEnd> Children: None [1..1] A <connection> is an element to determine which branches of a track are connected at a certain position211 bytes (148 words) - 16:28, 20 July 2022
- IS:connection trackBegin (section Position of connection in the XML-Tree / Position von connection im XML-Baum)connection Parent: <trackBegin> Children: None [1..1] A <connection> is an element to determine which branches of a track are connected at a certain215 bytes (148 words) - 11:12, 22 January 2013
- IS:connection crossing (section Position of connection in the XML-Tree / Position von connection im XML-Baum)mileage) incoming: A track is merging into the principal track, tracks are converging relative to the direction outgoing: A track is splitting out from2 KB (699 words) - 19:20, 22 January 2024
- </connections> </trackTopology> </track> <track id="tr02"> <trackTopology> <trackBegin id="tb02" pos="0"> <connection id="tbcx02" ref="tecx01"/> </trackBegin>15 KB (1,768 words) - 18:26, 19 January 2024
- must reference one or more <trainPart>s, that all <trackElements> must have a position on the <track>, that the length of a <tunnel> is a decimal number10 bytes (579 words) - 15:58, 18 May 2020
- IS:connection switch (section Position of connection in the XML-Tree / Position von connection im XML-Baum)</switch> </connections> <!-- ... --> </trackTopology> <!-- ... --> </track> <track id="tr2" name="1" type="mainTrack"> <trackTopology> <!-- ... --> <trackEnd id="te2"5 KB (1,094 words) - 19:21, 22 January 2024
- IS:trackTopology (section Position of trackTopology in the XML-Tree / Position von trackTopology im XML-Baum)trackTopology Parent: <track> Children: <borders>, <connections>, <crossSections>, <mileageChanges>, <trackBegin>, <trackEnd> [1..1] The element <trackTopology>484 bytes (52 words) - 19:07, 13 January 2017
- IS:macroscopicNode (redirect from IS:macroscopicNode trackBegin)macroscopicNode Parent: <trackBegin>, <trackEnd> Children: None [1..1] A <macroscopicNode> represents a logical connection of (multiple) tracks without respect4 KB (440 words) - 19:38, 22 January 2024
- event, informationAreaRef <originalTrackInfo> trackInfo, trackRef <trackInfo> operatingPeriodRef, platform, track <organizationalUnitBinding> <vehicleOperator>112 KB (4,754 words) - 18:02, 3 April 2022
- IS:openEnd (redirect from IS:openEnd trackBegin)indicates that a track is terminated without any possibility for trains to enter or leave the track. The <connection> in other <trackBegin>s and <trackEnd>s, or2 KB (511 words) - 19:44, 22 January 2024
- IS:connections (section Position of connections in the XML-Tree / Position von connections im XML-Baum)connections Parent: <trackTopology> Children: <crossing>, <switch> [0..1] A connections is a container keeping all connecting elements in railML® which377 bytes (49 words) - 19:22, 22 January 2024
- Element <connection>, child of <trackBegin> Element <connection>, child of <trackEnd> Element <connection>, child of <crossing> Element <connection>, child164 bytes (20 words) - 16:50, 21 March 2018