UC:IS:UseCases: Difference between revisions
Jump to navigation
Jump to search
[checked revision] | [checked revision] |
m (→List of Use Cases: typos) |
(→List of Use Cases: renaming and completing abbreviations) |
||
Line 11: | Line 11: | ||
|RINF Meldung | |RINF Meldung | ||
| | | | ||
| | |RINR | ||
| | | | ||
|Veraltet | |Veraltet | ||
Line 43: | Line 43: | ||
| | | | ||
| | | | ||
| | |ASSR | ||
|DLR for IN2Rail project | |DLR for IN2Rail project | ||
| | | | ||
Line 51: | Line 51: | ||
|Erfassung der Schieneninfrastruktur | |Erfassung der Schieneninfrastruktur | ||
| | | | ||
| | |ISRC | ||
|Bahnkonzept | |Bahnkonzept | ||
| | | | ||
Line 59: | Line 59: | ||
|Austausch von Planungsparametern für Stellwerke mit Herstellern | |Austausch von Planungsparametern für Stellwerke mit Herstellern | ||
| | | | ||
| | |ISIL | ||
| | | | ||
|Aktuell | |Aktuell | ||
Line 91: | Line 91: | ||
|Kapazitätsplanung | |Kapazitätsplanung | ||
| | | | ||
| | |CAPL | ||
|Jernbaneverket | |Jernbaneverket | ||
| | | | ||
Line 99: | Line 99: | ||
|NRE Meldung | |NRE Meldung | ||
| | | | ||
| | |NRER | ||
|ÖBB | |ÖBB | ||
| | | | ||
Line 107: | Line 107: | ||
|Verzeichnis der zulässigen Geschwindigkeiten | |Verzeichnis der zulässigen Geschwindigkeiten | ||
| | | | ||
| | |SPED | ||
|ÖBB | |ÖBB | ||
| | | | ||
Line 115: | Line 115: | ||
|Fahrplanerstellung | |Fahrplanerstellung | ||
| | | | ||
| | |ISTT | ||
|ProRail | |ProRail | ||
| | | | ||
Line 123: | Line 123: | ||
|CAD für Zugsignalisierung | |CAD für Zugsignalisierung | ||
| | | | ||
| | |CASP | ||
|RailComplete | |RailComplete | ||
| | | | ||
Line 139: | Line 139: | ||
|Visualisierung von Schieneninfrastruktur | |Visualisierung von Schieneninfrastruktur | ||
| | | | ||
| | |ISVI | ||
| | | | ||
|Veraltet | |Veraltet | ||
|} | |} |
Revision as of 15:47, 30 October 2016
| ||||||||
|
This page provides use cases specific to the IS-subschema. See Dev:Use cases to learn what is a use case, how to contribute to writing good railML®-Use Cases and where to find them in this wiki.
List of Use Cases
The following list provides links to the use cases for the exchange of data between applications related with railway infrastructure:
Priority | Description (EN) | Description (DE) | Description (FR) | Abbreviation | Reported by | Status |
---|---|---|---|---|---|---|
1 | RINF Reporting | RINF Meldung | RINR | Veraltet | ||
1 | Network statement of an infrastructure manager | Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers | Document de référence du réseau de opérateur réseau ferroviaire | NEST | Veraltet | |
1 | Schematic trac plan | SCTP | ||||
2 | Positioning and Map-Matching | Positionierung und Kartenvergleich | POSI | Aktuell | ||
2 | Asset status representation | ASSR | DLR for IN2Rail project | |||
3 | Railway Infrastructure Recording | Erfassung der Schieneninfrastruktur | ISRC | Bahnkonzept | ||
3 | Exchange of planning parameters for interlocking with suppliers | Austausch von Planungsparametern für Stellwerke mit Herstellern | ISIL | Aktuell | ||
3 | Driver Advisory System (DAS) | Fahrerassistenzsystem | DASY | Aktuell | ||
3 | Maintenance Planning | Wartungsplanung | MAPL | Aktuell | ||
3 | Passenger Information System | Passagierinformationssystem | PISY | Aktuell | ||
3 | Capacity Planning | Kapazitätsplanung | CAPL | Jernbaneverket | ||
3 | NRE Reporting | NRE Meldung | NRER | ÖBB | ||
3 | Speed directory | Verzeichnis der zulässigen Geschwindigkeiten | SPED | ÖBB | ||
3 | Timetabling | Fahrplanerstellung | ISTT | ProRail | ||
3 | CAD for railway signaling | CAD für Zugsignalisierung | CASP | RailComplete | ||
3 | Capture schematic visualisation information of track assets | Erstellung schematischer Visualisierungsinformationen von Schienenanlagen | ||||
3 | Railway Infrastructure Visualisation | Visualisierung von Schieneninfrastruktur | ISVI | Veraltet |