UC:IL:UseCases: Difference between revisions
Jump to navigation
Jump to search
[checked revision] | [checked revision] |
(→List of Use Cases for Interlocking: Typos and formatting for former use case name changed) |
m (Abbreviations RtSim, DPSig) |
||
Line 9: | Line 9: | ||
! Priority !! Description (EN) !! Description (DE) !! Description (FR) !! Abbreviation !! Reported by !! Status<br><span style="font-size:50%">[[Dev:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span> | ! Priority !! Description (EN) !! Description (DE) !! Description (FR) !! Abbreviation !! Reported by !! Status<br><span style="font-size:50%">[[Dev:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span> | ||
|- | |- | ||
| 1 || [[IL:UC:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||'' | | 1 || [[IL:UC:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||''RtSim''|| Jernbanedirektoratet Capacity Dpt || consolidated | ||
|- | |- | ||
| 2 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] || || EULYNX || requirements | | 2 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] ||''DPSig'' || EULYNX || requirements | ||
|- | |- | ||
| 3 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft | | 3 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft |
Revision as of 11:58, 4 May 2018
| ||||||||
|
This page provides use cases specific to the IL-subschema. See Dev:Use cases to learn what is a use case, how to contribute to writing good railML®-Use Cases and where to find them in this wiki.
List of Use Cases for Interlocking
The following list provides links to the use cases related with interlocking:
Priority | Description (EN) | Description (DE) | Description (FR) | Abbreviation | Reported by | Status how to interpret the status |
---|---|---|---|---|---|---|
1 | Routes for timetable simulation (former: Capacity operational simulation) |
Fahrstrassen für Fahrplan simulieren (ehemals: Leistungsfähigkeit Simulation) |
RtSim | Jernbanedirektoratet Capacity Dpt | consolidated | |
2 | Data prepration for signalling | Datenbereitstellung für Stellwerkssysteme | [[IL:UC:EulynxDataPreparationInterlocking|]] | DPSig | EULYNX | requirements |
3 | Interlocking engineering for signalling | Stellwerkstechnik für Signalisierung | [[IL:UC:InterlockEngineeringForSignallingWithinJBV|]] | Jernbaneverket Signalling Dpt | draft | |
4 | Interlocking engineering | Stellwerksprojektierung | [[IL:UC:InterlockingEngineering|]] | draft | ||
5 | Operation and Control | Betriebsführung | draft | |||
6 | Site preparation data for Signal Controlled Warning Systems | Daten zur Standortvorbereitung für Rottenwarnsysteme | SCWS | Thales Austria | draft | |
7 | Hardware and cable plan | Aussenanlage und Kabelplan | draft |