Talk:UC:TT:ATimetableForACompetition

From railML 2 Wiki
Jump to navigation Jump to search

Review by IVU AG

Timetable period

  • Holiday planning might be relevant for tenders, as it affects costs. This is covered already by existing functionality.

Vehicles and formations

We see two usecases for formation planning: - the rolling stock is provided by the contractor. In this case, the tender refers to specific vehicle types and formations. - the bidder is expected to provide the rolling stock. In this case, commercial requirements are defined for trains or train sections.

The standard should allow to distinguish these cases.

Infrastructure

Infrastructure requirements as electricity or maximum weight might be relevant if rolling stock is to be provided by bidder.

Rostering

We don't see a use case for circulations.

Improvements for further versions

The use case where the bidder has significant flexibility in designing the timetable (varying running time of trains, varying departure times within regular interval schedule) would need more elaboration if demand arises.