UC:Use cases/table: Difference between revisions

From railML 2 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
m (change priority of IL-UC)
(adding use case ITMS)
Line 63: Line 63:
|SNCF Réseau
|SNCF Réseau
|consolidated
|consolidated
|-
|IS
|
|2
|[[IS:UC:IntegratedTMS|Integrated TMS]]
|{{Deu|Integriertes Verkehrsmanagement}}
|{{Fra|-}}
|ITMS
|Bombardier
|draft
|-
|-
|IS
|IS

Revision as of 11:36, 11 January 2019

RailML Trademark RGB V2.png
XML Railway exchange format
https://railML.org
Latest release: 2.5
(September 1st, 2021)
 
Main Menu
 
Subschemas
XML tree
UML diagrams
Use cases
Versions & Changes

CO Use CasesIL Use CasesIS Use CasesRS Use CasesTT Use CasesCategory:Use cases by company

Directing Subschema
Involved Subschemas
Priority
Description (EN) Description (DE) Description (FR)
Abbreviation
Reported by Status
how to interpret the status
IL 1 Routes for timetable simulation
(former: Capacity operational simulation)
Fahrstrassen für Fahrplan simulieren
(ehemals: Leistungsfähigkeit Simulation)
RSIM Jernbanedirektoratet/BaneNOR
(erstwhile: Jernbanedirektoratet Capacity Dpt)
consolidated
IL 1 Interlocking module engineering data
(former: Interlocking engineering)
Stellwerksprojektierung [[IL:UC:InterlockingEngineering|]] IMED Thales Germany consolidated
IL 3 Data prepration for signalling Datenbereitstellung für Stellwerkssysteme [[IL:UC:EulynxDataPreparationInterlocking|]] DPRS EULYNX (erstwhile) draft
IL 3 Interlocking engineering for signalling Stellwerkstechnik für Signalisierung [[IL:UC:InterlockEngineeringForSignallingWithinJBV|]] Jernbaneverket Signalling Dpt draft
IL 4 Operation and Control Betriebsführung draft
IL 5 Site preparation data for Signal Controlled Warning Systems Daten zur Standortvorbereitung für Rottenwarnsysteme SCWS Thales Austria draft
IL 6 Hardware and cable plan Aussenanlage und Kabelplan draft
IS 1 Network statement of an infrastructure manager Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers NEST SŽDC/​ProRail/​BaneNOR consolidated
IS 1 Schematic Track Plan Schematische Gleisplandarstellung SCTP JBD/BaneNOR consolidated
IS 1 RINF Reporting RINF Meldung RINR SNCF Réseau consolidated
IS 2 Integrated TMS Integriertes Verkehrsmanagement ITMS Bombardier draft
IS 2 Track Geometry Gleisgeometrie TRGE ÖBB Infrastruktur review
IS 2 Positioning and Map-Matching Positionierung und Kartenvergleich POSI draft
IS 2 Asset status representation Darstellung des Infrastrukturzustands ASSR DLR for IN2Rail project draft
IS 3 Railway Infrastructure Recording Erfassung der Schieneninfrastruktur ISRC Bahnkonzept draft
IS TT 3 Driver Advisory System (DAS) Fahrerassistenzsystem DASY IS draft
IS 3 Exchange of planning parameters for interlocking with suppliers Austausch von Planungsparametern für Stellwerke mit Her­stel­lern ISIL IS draft
IS 3 Maintenance Planning Wartungsplanung MAPL draft
IS 3 Passenger Information System Fahrgast-Informationssystem PISY draft
IS 3 Capacity Planning Kapazitätsplanung CAPL JBV/BaneNOR draft
IS 3 NRE Reporting NRE Meldung NRER ÖBB Infrastruktur draft
IS 3 Speed directory Verzeichnis der zulässigen Geschwindigkeiten SPED ÖBB Infrastruktur draft
IS 3 Timetabling Fahrplanerstellung ISTT ProRail draft
IS 3 CAD for railway signaling CAD für Zugsignalisierung CASP RailComplete draft
IS 3 Capture schematic visualisation information of track assets Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen draft
IS 3 Railway Simulation Laboratory Eisenbahnbetriebslabor RLAB ČVUT draft
IS Railway Infrastructure Visualisation Visualisierung von Schieneninfrastruktur ISVI outdated
IS 3 ETCS track net ETCS Thales draft
RS Traction power supply simulation Simulation der Bahnstromversorgung
RS Operational simulation Betriebssimulation
TT Timetable Information Fahrplanauskunft writer: HaCon (13.03.15); reviewer: IVU consolidated
TT Passenger information at stations Fahrgastinformation am Bahnhof writer: PSI (20.05.15); reviewer: iRFP draft
TT A timetable for a competition (call for proposals) Ausschreibungsfahrplan writer: iRFP (21.05.15); reviewer: IVU (22.09.16) consolidated
TT Import complete timetable for vehicle working scheduling and vehicle workings Umlaufbildung Fahrzeuge Jahresfahrplan writer: IVU (20.05.15); reviewer: iRFP draft
TT Adopt vehicle working scheduling to timetable changes Umlauf an Jahresfahrplan anpassen writer: IVU (21.05.15) ; reviewer: HaCon consolidated
TT Exchange of formation data Austausch von Wagenreihungen/ Behängungsdaten writer: iRFP (21.05.15); reviewer: IVU (22.09.16) consolidated
TT TAF/TAP TSI requirements TAF/TAP TSI Anforderungen writer: ERA; reviewer: ??? draft
TT Long Term Strategic Timetabling Langfrist-Fahrplanerstellung writer: SMA (22.12.16); reviewer: HaCon draft
TT Slot ordering Trassenbestellung writer: SMA (17.09.16); reviewer: iRFP draft
TT Passenger information inside the train Fahrgastinformation im Zug writer: Interautomation (17.01.17); reviewer: PSI and iRFP draft
TT Automatic Route Setting (ARS)
Automatic Train Supervision (ATS)
Zuglenkung writer: Toshiba?;
reviewer: PSI
planned
TT Be­triebs­leit­sys­te­me/​RBL writer: PSI; reviewer: IVU planned
TT Dienstbildung Personal Jahresfahrplan writer: INIT; reviewer: IVU postponed
TT Operational simulation timetable Betriebssimulation Fahrplan writer: OTRT?; reviewer: SMA postponed