UC:Use cases/table: Difference between revisions

From railML 2 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
(+Traffic Management Plan)
(Redirektauflösung)
(6 intermediate revisions by 3 users not shown)
Line 5: Line 5:
! style="width:5%"|<div style="writing-mode: tb-rl;">Directing Subschema</div> !! <div style="writing-mode: tb-rl;">Involved Subschemas</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version</div> !! <div style="writing-mode: tb-rl;">Priority</div> !! style="width:15%"|Description (EN) !! style="width:15%"|Description (DE) !! style="width:15%"|Description (FR) !! <div style="writing-mode: tb-rl;">Abbreviation</div> !! style="width:15%"|Reported by !! Status<br><span style="font-size:50%">[[UC:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span>
! style="width:5%"|<div style="writing-mode: tb-rl;">Directing Subschema</div> !! <div style="writing-mode: tb-rl;">Involved Subschemas</div> !! <div style="writing-mode: tb-rl;">Implemented in {{rml}} version</div> !! <div style="writing-mode: tb-rl;">Priority</div> !! style="width:15%"|Description (EN) !! style="width:15%"|Description (DE) !! style="width:15%"|Description (FR) !! <div style="writing-mode: tb-rl;">Abbreviation</div> !! style="width:15%"|Reported by !! Status<br><span style="font-size:50%">[[UC:Use_cases#How_to_interpret_the_status|how to interpret the status]]</span>
|-
|-
| IL
|IL
|
|IS
|3.1
|3.1
|
|X
| [[IL:UC:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||RSIM||Jernbanedirektoratet/BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)|| consolidated
| [[UC:IL:Simulation|Routes for timetable simulation<br />''(former: Capacity operational simulation)'']] || {{Deu|Fahrstrassen für Fahrplan simulieren <br />''(ehemals: Leistungsfähigkeit Simulation)''}} |||{{Fra|<br />''(ancien: Simulation de la capacité)''}}||RSIM||Jernbanedirektoratet/BaneNOR<br/> (erstwhile: Jernbanedirektoratet Capacity Dpt)|| consolidated
|-
|-
| IL
|IL
|
|
|
|3.1
| 1 || [[IL:UC:InterlockingEngineering|Interlocking module engineering data<br />''(former: Interlocking engineering)'']] || [[IL:UC:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[IL:UC:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || IMED || Thales Germany || consolidated
| X || [[UC:IL:InterlockingEngineering|Interlocking module engineering data<br />''(former: Interlocking engineering)'']] || [[UC:IL:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[UC:IL:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || IMED || Thales Germany || consolidated
|-
|-
| IL
|IL
|
|
|
|
| 3 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] ||DPRS||EULYNX ''(erstwhile)''|| draft
| 3 || [[UC:IL:EulynxDataPreparationInterlocking|Data prepration for signalling]] || [[UC:IL:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[UC:IL:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] ||DPRS||EULYNX ''(erstwhile)''|| draft
|-
|-
| IL
|IL
|
|
|
|
| 3 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft
| 3 || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[UC:IL:InterlockEngineeringForSignallingWithinJBV|{{Fra|Systèmes de verrouillage de la signalisation}}]] || || Jernbaneverket Signalling Dpt || draft
|-
|-
| IL
|IL
|
|
|
|
| 4 || [[IL:UC:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|Commande et Control}}||  || || draft
| 4 || [[UC:IL:OperationAndControl|Operation and Control]]||{{Deu|Betriebsführung}}|||{{Fra|Commande et Control}}||  || || draft
|-
|-
| IL
|IL
|
|
|
|
| 5 || [[IL:UC:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}|| SCWS||Thales Austria|| draft
| 5 || [[UC:IL:SitePreparationDataForSignalControlledWarningSystems|Site preparation data for Signal Controlled Warning Systems]]||{{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}} |||{{Fra|Données de préparation pour le Systèmes d'avertissement commandés par signal}}|| SCWS||Thales Austria|| draft
|-
|-
| IL
|IL
|
|
|
|
| 6 || [[IL:UC:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|Plan matériel et câble}}|| || || draft
| 6 || [[UC:IL:HardwareAndCablePlan|Hardware and cable plan]]||{{Deu|Aussenanlage und Kabelplan}}|||{{Fra|Plan matériel et câble}}|| || || draft
|-
|-
|{{anchor|NEST}}IS
|{{anchor|NEST}}IS
|
|
|3.1
|3.1
|
|X
|[[IS:UC:NetworkStatement|Network statement of an infrastructure manager]]
|[[UC:IS:NetworkStatement|Network statement of an infrastructure manager]]
|{{Deu|Schie&shy;nen&shy;netz&shy;be&shy;nut&shy;zungs&shy;be&shy;din&shy;gun&shy;gen eines Infrastrukturbetreibers}}
|{{Deu|Schie&shy;nen&shy;netz&shy;be&shy;nut&shy;zungs&shy;be&shy;din&shy;gun&shy;gen eines Infrastrukturbetreibers}}
|{{Fra|Document de référence du réseau de opérateur réseau ferroviaire}}
|{{Fra|Document de référence du réseau de opérateur réseau ferroviaire}}
Line 55: Line 55:
|
|
|3.1
|3.1
|
|X
|[[IS:UC:Schematic Track Plan|Schematic Track Plan]]
|[[UC:IS:Schematic Track Plan|Schematic Track Plan]]
|{{Deu|Schematische Gleisplandarstellung}}
|{{Deu|Schematische Gleisplandarstellung}}
|{{Fra|Plan du tracé schématique}}
|{{Fra|Plan du tracé schématique}}
Line 66: Line 66:
|
|
|3.1
|3.1
|
|X
|[[IS:UC:RINFReporting|RINF Reporting]]
|[[UC:IS:RINFReporting|RINF Reporting]]
|{{Deu|RINF Meldung}}
|{{Deu|RINF Meldung}}
|{{Fra|Rapports RINF}}
|{{Fra|Rapports RINF}}
Line 78: Line 78:
|
|
|2
|2
|[[IS:UC:IntegratedTMS|Integrated TMS]]
|[[UC:IS:IntegratedTMS|Integrated TMS]]
|{{Deu|Integriertes Verkehrsmanagement}}
|{{Deu|Integriertes Verkehrsmanagement}}
|{{Fra|-}}
|{{Fra|-}}
Line 89: Line 89:
|
|
|2
|2
|[[IS:UC:Track Geometry|Track Geometry]]
|[[UC:IS:Track Geometry|Track Geometry]]
|{{Deu|Gleisgeometrie}}
|{{Deu|Gleisgeometrie}}
|
|
Line 100: Line 100:
|
|
|2
|2
|[[IS:UC:PositioningAndMap-Matching|Positioning and Map-Matching]]
|[[UC:IS:PositioningAndMap-Matching|Positioning and Map-Matching]]
|{{Deu|Positionierung und Kartenvergleich}}
|{{Deu|Positionierung und Kartenvergleich}}
|{{Fra|Positionnement et correspondance avec la carte}}
|{{Fra|Positionnement et correspondance avec la carte}}
Line 111: Line 111:
|
|
|2
|2
|[[IS:UC:Asset status representation|Asset status representation]]
|[[UC:IS:Asset status representation|Asset status representation]]
|{{Deu|Darstellung des Infrastrukturzustands}}
|{{Deu|Darstellung des Infrastrukturzustands}}
|{{Fra|Représentation de l'actif}}
|{{Fra|Représentation de l'actif}}
Line 122: Line 122:
|
|
|3
|3
|[[IS:UC:RailwayInfrastructureRecording|Railway Infrastructure Recording]]
|[[UC:IS:RailwayInfrastructureRecording|Railway Infrastructure Recording]]
|{{Deu|Erfassung der Schieneninfrastruktur}}
|{{Deu|Erfassung der Schieneninfrastruktur}}
|{{Fra|Enregistrement des infrastructures ferroviaires}}
|{{Fra|Enregistrement des infrastructures ferroviaires}}
Line 133: Line 133:
|
|
|3
|3
|[[IS:UC:DriverAdvisorySystem|Driver Advisory System (DAS)]]
|[[UC:IS:DriverAdvisorySystem|Driver Advisory System (DAS)]]
|{{Deu|Fahrerassistenzsystem}}
|{{Deu|Fahrerassistenzsystem}}
|{{Fra|Système d'assistance au conducteur (DAS)}}
|{{Fra|Système d'assistance au conducteur (DAS)}}
Line 144: Line 144:
|
|
|3
|3
|[[IS:UC:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]]
|[[UC:IS:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]]
|{{Deu|Austausch von Planungsparametern für Stellwerke mit Her&shy;stel&shy;lern}}
|{{Deu|Austausch von Planungsparametern für Stellwerke mit Her&shy;stel&shy;lern}}
|{{Fra|Échange de paramètres de planification pour l'interconnexion avec les fournisseurs}}
|{{Fra|Échange de paramètres de planification pour l'interconnexion avec les fournisseurs}}
Line 155: Line 155:
|
|
|3
|3
|[[IS:UC:MaintenancePlanning|Maintenance Planning]]
|[[UC:IS:MaintenancePlanning|Maintenance Planning]]
|{{Deu|Wartungsplanung}}
|{{Deu|Wartungsplanung}}
|{{Fra|Planification de la maintenance}}
|{{Fra|Planification de la maintenance}}
Line 166: Line 166:
|
|
|3
|3
|[[IS:UC:PassengerInformationSystem|Passenger Information System]]
|[[UC:IS:PassengerInformationSystem|Passenger Information System]]
|{{Deu|Fahrgast-Informationssystem}}
|{{Deu|Fahrgast-Informationssystem}}
|{{Fra|Système d'information voyageurs}}
|{{Fra|Système d'information voyageurs}}
Line 177: Line 177:
|
|
|3
|3
|[[IS:UC:CapacityPlanning|Capacity Planning]]
|[[UC:IS:CapacityPlanning|Capacity Planning]]
|{{Deu|Kapazitätsplanung}}
|{{Deu|Kapazitätsplanung}}
|{{Fra|Planification de la capacité}}
|{{Fra|Planification de la capacité}}
Line 188: Line 188:
|
|
|3
|3
|[[IS:UC:NREReporting|NRE Reporting]]
|[[UC:IS:NREReporting|NRE Reporting]]
|{{Deu|NRE Meldung}}
|{{Deu|NRE Meldung}}
|{{Fra|Rapports NRE}}
|{{Fra|Rapports NRE}}
Line 199: Line 199:
|
|
|3
|3
|[[IS:UC:Speeddirectory|Speed directory]]
|[[UC:IS:Speeddirectory|Speed directory]]
|{{Deu|Verzeichnis der zulässigen Geschwindigkeiten}}
|{{Deu|Verzeichnis der zulässigen Geschwindigkeiten}}
|{{Fra|Liste des vitesses autorisées}}
|{{Fra|Liste des vitesses autorisées}}
Line 210: Line 210:
|
|
|3
|3
|[[IS:UC:Timetabling|Timetabling]]
|[[UC:IS:Timetabling|Timetabling]]
|{{Deu|Fahrplanerstellung}}
|{{Deu|Fahrplanerstellung}}
|{{Fra|horaires}}
|{{Fra|horaires}}
Line 221: Line 221:
|
|
|3
|3
|[[IS:UC:CADForRailwaySignaling|CAD for railway signaling]]
|[[UC:IS:CADForRailwaySignaling|CAD for railway signaling]]
|{{Deu|CAD für Zugsignalisierung}}
|{{Deu|CAD für Zugsignalisierung}}
|{{Fra|CAD pour la signalisation ferroviaire}}
|{{Fra|CAD pour la signalisation ferroviaire}}
Line 232: Line 232:
|
|
|3
|3
|[[IS:UC:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]]
|[[UC:IS:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]]
|{{Deu|Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen}}
|{{Deu|Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen}}
|{{Fra|Capture des informations de visualisation schématique des actifs de la piste}}
|{{Fra|Capture des informations de visualisation schématique des actifs de la piste}}
Line 243: Line 243:
|
|
|3
|3
|[[IS:UC:Railway Simulation Laboratory|Railway Simulation Laboratory]]
|[[UC:IS:Railway Simulation Laboratory|Railway Simulation Laboratory]]
|{{Deu|Eisenbahnbetriebslabor}}
|{{Deu|Eisenbahnbetriebslabor}}
|{{Fra|Laboratoire de simulation ferroviaire}}
|{{Fra|Laboratoire de simulation ferroviaire}}
Line 253: Line 253:
|
|
|
|
|
|9
|[[IS:UC:RailwayInfrastructureVisualisation|Railway Infrastructure Visualisation]]
|[[UC:IS:RailwayInfrastructureVisualisation|Railway Infrastructure Visualisation]]
|{{Deu|Visualisierung von Schieneninfrastruktur}}
|{{Deu|Visualisierung von Schieneninfrastruktur}}
|{{Fra|Visualisation de l'infrastructure ferroviaire}}
|{{Fra|Visualisation de l'infrastructure ferroviaire}}
Line 276: Line 276:
|
|
|
|
|[[RS:UC:TractionPowerSupplySimulation|Traction power supply simulation]]
|[[UC:RS:TractionPowerSupplySimulation|Traction power supply simulation]]
|{{Deu|Simulation der Bahnstromversorgung}}
|{{Deu|Simulation der Bahnstromversorgung}}
|
|
Line 287: Line 287:
|
|
|
|
|[[RS:UC:OperationalSimulation|Operational simulation]]
|[[UC:RS:OperationalSimulation|Operational simulation]]
|{{Deu|Betriebssimulation}}
|{{Deu|Betriebssimulation}}
|
|
Line 298: Line 298:
|
|
|
|
|[[TT:UC:TimetableInformation |Timetable Information]]
|[[UC:TT:TimetableInformation |Timetable Information]]
|{{Deu|Fahrplanauskunft}}
|{{Deu|Fahrplanauskunft}}
|{{Fra|Renseignement sur l'horaire}}
|{{Fra|Renseignement sur l'horaire}}
Line 308: Line 308:
|
|
|
|
|
|1
|[[TT:UC:PassengerInformationAtStations|Passenger information at stations]]
|[[UC:TT:PassengerInformationAtStations|Passenger information at stations]]
|{{Deu|Fahrgastinformation am Bahnhof }}
|{{Deu|Fahrgastinformation am Bahnhof }}
|{{Fra|Information voyageurs en station}}
|
|
|
|<font color="green">writer: PSI (20.05.15)</font color>; <font color="green">reviewer: Init</font color>
|<font color="green">writer: PSI (20.05.15)</font color>; <font color="red">reviewer: iRFP</font color>
|consolidated
|draft
|-
|-
|TT
|TT
Line 320: Line 320:
|
|
|
|
|[[TT:UC:ATimetableForACompetition|A timetable for a competition (call for proposals)]]
|[[UC:TT:ATimetableForACompetition|A timetable for a competition (call for proposals)]]
|{{Deu|Ausschreibungsfahrplan}}
|{{Deu|Ausschreibungsfahrplan}}
|
|
Line 331: Line 331:
|
|
|
|
|[[TT:UC:ImportCompleteTimetableForVehicleWorkingSchedulingAndVehicleWorkings|Import complete timetable for vehicle working scheduling and vehicle workings]]
|[[UC:TT:ImportCompleteTimetableForVehicleWorkingSchedulingAndVehicleWorkings|Import complete timetable for vehicle working scheduling and vehicle workings]]
|{{Deu|Umlaufbildung Fahrzeuge Jahresfahrplan}}
|{{Deu|Umlaufbildung Fahrzeuge Jahresfahrplan}}
|
|
Line 342: Line 342:
|
|
|
|
|[[TT:UC:AdoptVehicleWorkingSchedulingToTimetableChanges|Adopt vehicle working scheduling to timetable changes]]
|[[UC:TT:AdoptVehicleWorkingSchedulingToTimetableChanges|Adopt vehicle working scheduling to timetable changes]]
|{{Deu|Umlauf an Jahresfahrplan anpassen}}
|{{Deu|Umlauf an Jahresfahrplan anpassen}}
|
|
Line 353: Line 353:
|
|
|
|
|[[TT:UC:ExchangeOfFormationData|Exchange of formation data]]
|[[UC:TT:ExchangeOfFormationData|Exchange of formation data]]
|{{Deu|Austausch von Wagenreihungen/ Behängungsdaten}}
|{{Deu|Austausch von Wagenreihungen/ Behängungsdaten}}
|
|
Line 364: Line 364:
|
|
|
|
|[[TT:UC:TAF/TAP TSI |TAF/TAP TSI requirements]]
|[[UC:TT:TAF/TAP TSI |TAF/TAP TSI requirements]]
|{{Deu|TAF/TAP TSI Anforderungen}}
|{{Deu|TAF/TAP TSI Anforderungen}}
|
|
Line 375: Line 375:
|
|
|
|
|[[TT:UC:LongTermStrategicTimetabling |Long Term Strategic Timetabling]]
|[[UC:TT:LongTermStrategicTimetabling |Long Term Strategic Timetabling]]
|{{Deu|Langfrist-Fahrplanerstellung}}
|{{Deu|Langfrist-Fahrplanerstellung}}
|
|
Line 386: Line 386:
|
|
|
|
|[[TT:UC:SlotOrdering |Slot ordering]]
|[[UC:TT:SlotOrdering |Slot ordering]]
|{{Deu|Trassenbestellung}}
|{{Deu|Trassenbestellung}}
|
|
Line 397: Line 397:
|
|
|
|
|[[TT:UC:FGIInTrain|Passenger information inside the train]]
|[[UC:TT:FGIInTrain|Passenger information inside the train]]
|{{Deu|Fahrgastinformation im Zug}}
|{{Deu|Fahrgastinformation im Zug}}
|
|
Line 441: Line 441:
|
|
|
|
|[[TT:UC:OperationalSimulationTimetable |Operational simulation timetable]]
|<!-->[[UC:TT:OperationalSimulationTimetable|-->Operational simulation timetable
|{{Deu|Betriebssimulation Fahrplan}}
|{{Deu|Betriebssimulation Fahrplan}}
|
|
Line 451: Line 451:
|IL, IS, RS
|IL, IS, RS
|
|
|
|2
|[[TT:UC:TrafficManagementPlan|Traffic Management Plan]]
|[[UC:TT:TrafficManagementPlan|Traffic Management Plan]]
|
|
|
|
|
|
|<font color="red">writer: Thales</font color>
|<font color="red">writer: Thales</font color>; <font color="red">reviewer: ???</font color>
|draft
|draft
|}
|}

Revision as of 16:14, 24 November 2019

Return to article

Directing Subschema
Involved Subschemas
Implemented in railML® version
Priority
Description (EN) Description (DE) Description (FR)
Abbreviation
Reported by Status
how to interpret the status
IL IS 3.1 X Routes for timetable simulation
(former: Capacity operational simulation)
Fahrstrassen für Fahrplan simulieren
(ehemals: Leistungsfähigkeit Simulation)
RSIM Jernbanedirektoratet/BaneNOR
(erstwhile: Jernbanedirektoratet Capacity Dpt)
consolidated
IL 3.1 X Interlocking module engineering data
(former: Interlocking engineering)
Stellwerksprojektierung [[UC:IL:InterlockingEngineering|]] IMED Thales Germany consolidated
IL 3 Data prepration for signalling Datenbereitstellung für Stellwerkssysteme [[UC:IL:EulynxDataPreparationInterlocking|]] DPRS EULYNX (erstwhile) draft
IL 3 Interlocking engineering for signalling Stellwerkstechnik für Signalisierung [[UC:IL:InterlockEngineeringForSignallingWithinJBV|]] Jernbaneverket Signalling Dpt draft
IL 4 Operation and Control Betriebsführung draft
IL 5 Site preparation data for Signal Controlled Warning Systems Daten zur Standortvorbereitung für Rottenwarnsysteme SCWS Thales Austria draft
IL 6 Hardware and cable plan Aussenanlage und Kabelplan draft
IS 3.1 X Network statement of an infrastructure manager Schie­nen­netz­be­nut­zungs­be­din­gun­gen eines Infrastrukturbetreibers NEST SŽDC/​ProRail/​BaneNOR consolidated
IS 3.1 X Schematic Track Plan Schematische Gleisplandarstellung SCTP JBD/BaneNOR consolidated
IS 3.1 X RINF Reporting RINF Meldung RINR SNCF Réseau merged into NEST
IS TT, IL 2 Integrated TMS Integriertes Verkehrsmanagement ITMS Bombardier draft
IS 2 Track Geometry Gleisgeometrie TRGE ÖBB Infrastruktur review
IS 2 Positioning and Map-Matching Positionierung und Kartenvergleich POSI draft
IS 2 Asset status representation Darstellung des Infrastrukturzustands ASSR DLR for IN2Rail project draft
IS 3 Railway Infrastructure Recording Erfassung der Schieneninfrastruktur ISRC Bahnkonzept draft
IS TT 3 Driver Advisory System (DAS) Fahrerassistenzsystem DASY IS draft
IS 3 Exchange of planning parameters for interlocking with suppliers Austausch von Planungsparametern für Stellwerke mit Her­stel­lern ISIL IS draft
IS 3 Maintenance Planning Wartungsplanung MAPL draft
IS 3 Passenger Information System Fahrgast-Informationssystem PISY draft
IS 3 Capacity Planning Kapazitätsplanung CAPL JBV/BaneNOR draft
IS 3 NRE Reporting NRE Meldung NRER ÖBB Infrastruktur draft
IS 3 Speed directory Verzeichnis der zulässigen Geschwindigkeiten SPED ÖBB Infrastruktur draft
IS 3 Timetabling Fahrplanerstellung ISTT ProRail draft
IS 3 CAD for railway signaling CAD für Zugsignalisierung CASP RailComplete draft
IS 3 Capture schematic visualisation information of track assets Erstellung schematischer Visualisierungs-Informationen von Schienenanlagen draft
IS 3 Railway Simulation Laboratory Eisenbahnbetriebslabor RLAB ČVUT draft
IS 9 Railway Infrastructure Visualisation Visualisierung von Schieneninfrastruktur ISVI outdated
IS IL 3 ETCS track net ETCS Thales draft
RS Traction power supply simulation Simulation der Bahnstromversorgung
RS Operational simulation Betriebssimulation
TT Timetable Information Fahrplanauskunft writer: HaCon (13.03.15); reviewer: IVU consolidated
TT 1 Passenger information at stations Fahrgastinformation am Bahnhof writer: PSI (20.05.15); reviewer: Init consolidated
TT A timetable for a competition (call for proposals) Ausschreibungsfahrplan writer: iRFP (21.05.15); reviewer: IVU (22.09.16) consolidated
TT Import complete timetable for vehicle working scheduling and vehicle workings Umlaufbildung Fahrzeuge Jahresfahrplan writer: IVU (20.05.15); reviewer: iRFP draft
TT Adopt vehicle working scheduling to timetable changes Umlauf an Jahresfahrplan anpassen writer: IVU (21.05.15) ; reviewer: HaCon consolidated
TT Exchange of formation data Austausch von Wagenreihungen/ Behängungsdaten writer: iRFP (21.05.15); reviewer: IVU (22.09.16) consolidated
TT TAF/TAP TSI requirements TAF/TAP TSI Anforderungen writer: ERA; reviewer: ??? draft
TT Long Term Strategic Timetabling Langfrist-Fahrplanerstellung writer: SMA (22.12.16); reviewer: HaCon draft
TT Slot ordering Trassenbestellung writer: SMA (17.09.16); reviewer: iRFP draft
TT Passenger information inside the train Fahrgastinformation im Zug writer: Interautomation (17.01.17); reviewer: PSI and iRFP draft
TT Automatic Route Setting (ARS)
Automatic Train Supervision (ATS)
Zuglenkung writer: Toshiba?;
reviewer: PSI
planned
TT Be­triebs­leit­sys­te­me/​RBL writer: PSI; reviewer: IVU planned
TT Dienstbildung Personal Jahresfahrplan writer: INIT; reviewer: IVU postponed
TT Operational simulation timetable Betriebssimulation Fahrplan writer: OTRT?; reviewer: SMA postponed
TT IL, IS, RS 2 Traffic Management Plan writer: Thales; reviewer: ??? draft