UC:TT:UseCases: Difference between revisions

From railML 2 Wiki
Jump to navigation Jump to search
[unchecked revision][unchecked revision]
No edit summary
m (iRFP as reviewer of UC TAF/TAP TSI requirements removed (was planned for booking system, but UC content changed))
Line 11: Line 11:
* [[TT:UC:AdoptVehicleWorkingSchedulingToTimetableChanges |Adopt vehicle working scheduling to timetable changes; {{Deu|Umlauf an Jahresfahrplan anpassen}} (<font color="green">writer: IVU (21.05.15) </font color>; <font color="green">reviewer: HaCon</font color>) ]]
* [[TT:UC:AdoptVehicleWorkingSchedulingToTimetableChanges |Adopt vehicle working scheduling to timetable changes; {{Deu|Umlauf an Jahresfahrplan anpassen}} (<font color="green">writer: IVU (21.05.15) </font color>; <font color="green">reviewer: HaCon</font color>) ]]
* [[TT:UC:ExchangeOfFormationData |Exchange of formation data; {{Deu|Austausch von Wagenreihungen/Behängungsdaten}} (<font color="green">writer: iRFP (21.05.15)</font color>; <font color="red">reviewer: ???</font color>)]]
* [[TT:UC:ExchangeOfFormationData |Exchange of formation data; {{Deu|Austausch von Wagenreihungen/Behängungsdaten}} (<font color="green">writer: iRFP (21.05.15)</font color>; <font color="red">reviewer: ???</font color>)]]
* [[TT:UC:TAF/TAP TSI |TAF/TAP TSI requirements; {{Deu|TAF/TAP TSI Anforderungen}} (<font color="green">writer: ERA</font color>; <font color="red">reviewer: iRFP</font color>) ]]
* [[TT:UC:TAF/TAP TSI |TAF/TAP TSI requirements; {{Deu|TAF/TAP TSI Anforderungen}} (<font color="green">writer: ERA</font color>; <font color="red">reviewer: ???</font color>) ]]
* Betriebssimulation Fahrplan (<font color="red">writer: OTRT</font color>; <font color="red">reviewer: SMA</font color>)
* Betriebssimulation Fahrplan (<font color="red">writer: OTRT</font color>; <font color="red">reviewer: SMA</font color>)
* Langfristfahrplanerstellung / Infrastruktur (<font color="red">writer: SMA</font color>; <font color="red">reviewer: ???</font color>)
* Langfristfahrplanerstellung / Infrastruktur (<font color="red">writer: SMA</font color>; <font color="red">reviewer: ???</font color>)

Revision as of 18:01, 20 January 2016

Use Cases for "Timetable and Rostering"

List of Use Cases

The following list provide links to the use cases related with the exchange of timetable data:

Glossary

  • LTP = long term planning: the yearly timetable(s)
  • STP = short term planning: changes to the current production timetable up to the point that changes can be published to downstream systems (passenger information, train control, train operators, etc.)