UC:IS:UseCases: Difference between revisions

From railML 2 Wiki
Jump to navigation Jump to search
[checked revision][checked revision]
(→‎List of Use Cases: Use cases sorted and language marked)
(Konsolidierung)
 
(11 intermediate revisions by 4 users not shown)
Line 1: Line 1:
{{navi}}
#redirect[[UC:Use cases/table]]
This page provides use cases specific to the [[infrastructure|IS-subschema]]. See [[Dev:Use cases]] to learn what is a use case, how to contribute to writing good {{rml}}-Use Cases and where to find them in this wiki.
== List of Use Cases ==
 
The following list provides links to the use cases for the exchange of data between applications related with railway infrastructure:
{| class="wikitable sortable"
! Priority !! Description (EN) !! Description (DE) !! Description (FR) !! Abbreviation !! Reported by !! Status
|-
|1
|[[IS:UC:Schematic Track Plan|Schematic Track Plan]]
|{{Deu|Schematische Gleisplandarstellung}}
|
|SCTP
|JBV/BaneNOR
|ongoing
|-
|1
|[[IS:UC:RINFReporting|RINF Reporting]]
|{{Deu|RINF Meldung}}
|
|RINR
|SNCF Réseau
|ongoing
|-
|1
|[[IS:UC:NetworkStatement|Network statement of an infrastructure manager]]
|{{Deu|Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers}}
|{{Fra|Document de référence du réseau de opérateur réseau ferroviaire}}
|NEST
|
|ongoing
|-
|2
|[[IS:UC:PositioningAndMap-Matching|Positioning and Map-Matching]]
|{{Deu|Positionierung und Kartenvergleich}}
|
|POSI
|
|draft
|-
|2
|[[IS:UC:Asset status representation|Asset status representation]]
|{{Deu|Darstellung des Infrastrukturzustands}}
|
|ASSR
|DLR for IN2Rail project
|draft
|-
|3
|[[IS:UC:RailwayInfrastructureRecording|Railway Infrastructure Recording]]
|{{Deu|Erfassung der Schieneninfrastruktur}}
|
|ISRC
|Bahnkonzept
|draft
|-
|3
|[[IS:UC:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]]
|{{Deu|Austausch von Planungsparametern für Stellwerke mit Herstellern}}
|
|ISIL
|
|draft
|-
|3
|[[IS:UC:DriverAdvisoryAystem|Driver Advisory System (DAS)]]
|{{Deu|Fahrerassistenzsystem}}
|
|DASY
|
|draft
|-
|3
|[[IS:UC:MaintenancePlanning|Maintenance Planning]]
|{{Deu|Wartungsplanung}}
|
|MAPL
|
|draft
|-
|3
|[[IS:UC:PassengerInformationSystem|Passenger Information System]]
|{{Deu|Fahrgastinformationssystem}}
|
|PISY
|
|draft
|-
|3
|[[IS:UC:CapacityPlanning|Capacity Planning]]
|{{Deu|Kapazitätsplanung}}
|
|CAPL
|JBV/BaneNOR
|draft
|-
|3
|[[IS:UC:NREReporting|NRE Reporting]]
|{{Deu|NRE Meldung}}
|
|NRER
|ÖBB-Infrastruktur
|draft
|-
|3
|[[IS:UC:Speeddirectory|Speed directory]]
|{{Deu|Verzeichnis der zulässigen Geschwindigkeiten}}
|
|SPED
|ÖBB-Infrastruktur
|draft
|-
|3
|[[IS:UC:Timetabling|Timetabling]]
|{{Deu|Fahrplanerstellung}}
|
|ISTT
|ProRail
|draft
|-
|3
|[[IS:UC:CADForRailwaySignaling|CAD for railway signaling]]
|{{Deu|CAD für Zugsignalisierung}}
|
|CASP
|RailComplete
|draft
|-
|3
|[[IS:UC:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]]
|{{Deu|Erstellung schematischer Visualisierungsinformationen von Schienenanlagen}}
|
|
|
|draft
|-
|3
|[[IS:UC:RailwayInfrastructureVisualisation|Railway Infrastructure Visualisation]]
|{{Deu|Visualisierung von Schieneninfrastruktur}}
|
|ISVI
|
|Veraltet
|-
|3
|[[IS:UC:Railway Simulation Laboratory|Railway Simulation Laboratory]]
|{{Deu|Eisenbahnbetriebslabor}}
|
|RLAB
|ČVUT
|draft
|}

Latest revision as of 15:59, 10 October 2018

Redirect to: