UC:IS:UseCases: Difference between revisions
Jump to navigation
Jump to search
[checked revision] | [checked revision] |
(→List of Use Cases: Ergänzungen RLAB) |
(→List of Use Cases: Use cases sorted and language marked) |
||
Line 6: | Line 6: | ||
{| class="wikitable sortable" | {| class="wikitable sortable" | ||
! Priority !! Description (EN) !! Description (DE) !! Description (FR) !! Abbreviation !! Reported by !! Status | ! Priority !! Description (EN) !! Description (DE) !! Description (FR) !! Abbreviation !! Reported by !! Status | ||
|- | |||
|1 | |||
|[[IS:UC:Schematic Track Plan|Schematic Track Plan]] | |||
|{{Deu|Schematische Gleisplandarstellung}} | |||
| | |||
|SCTP | |||
|JBV/BaneNOR | |||
|ongoing | |||
|- | |- | ||
|1 | |1 | ||
|[[IS:UC:RINFReporting|RINF Reporting]] | |[[IS:UC:RINFReporting|RINF Reporting]] | ||
|RINF Meldung | |{{Deu|RINF Meldung}} | ||
| | | | ||
|RINR | |RINR | ||
| | |SNCF Réseau | ||
|ongoing | |ongoing | ||
|- | |- | ||
|1 | |1 | ||
|[[IS:UC:NetworkStatement|Network statement of an infrastructure manager]] | |[[IS:UC:NetworkStatement|Network statement of an infrastructure manager]] | ||
|Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers | |{{Deu|Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers}} | ||
| Document de référence du réseau de opérateur réseau ferroviaire | |{{Fra|Document de référence du réseau de opérateur réseau ferroviaire}} | ||
|NEST | |NEST | ||
| | | | ||
|ongoing | |ongoing | ||
Line 33: | Line 33: | ||
|2 | |2 | ||
|[[IS:UC:PositioningAndMap-Matching|Positioning and Map-Matching]] | |[[IS:UC:PositioningAndMap-Matching|Positioning and Map-Matching]] | ||
| Positionierung und Kartenvergleich | |{{Deu|Positionierung und Kartenvergleich}} | ||
| | | | ||
|POSI | |POSI | ||
Line 41: | Line 41: | ||
|2 | |2 | ||
|[[IS:UC:Asset status representation|Asset status representation]] | |[[IS:UC:Asset status representation|Asset status representation]] | ||
|Darstellung des Infrastrukturzustands | |{{Deu|Darstellung des Infrastrukturzustands}} | ||
| | | | ||
|ASSR | |ASSR | ||
Line 49: | Line 49: | ||
|3 | |3 | ||
|[[IS:UC:RailwayInfrastructureRecording|Railway Infrastructure Recording]] | |[[IS:UC:RailwayInfrastructureRecording|Railway Infrastructure Recording]] | ||
|Erfassung der Schieneninfrastruktur | |{{Deu|Erfassung der Schieneninfrastruktur}} | ||
| | | | ||
|ISRC | |ISRC | ||
Line 57: | Line 57: | ||
|3 | |3 | ||
|[[IS:UC:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]] | |[[IS:UC:ExchangeOfPlanningParametersForInterlockingWithSuppliers|Exchange of planning parameters for interlocking with suppliers]] | ||
|Austausch von Planungsparametern für Stellwerke mit Herstellern | |{{Deu|Austausch von Planungsparametern für Stellwerke mit Herstellern}} | ||
| | | | ||
|ISIL | |ISIL | ||
Line 65: | Line 65: | ||
|3 | |3 | ||
|[[IS:UC:DriverAdvisoryAystem|Driver Advisory System (DAS)]] | |[[IS:UC:DriverAdvisoryAystem|Driver Advisory System (DAS)]] | ||
|Fahrerassistenzsystem | |{{Deu|Fahrerassistenzsystem}} | ||
| | | | ||
|DASY | |DASY | ||
Line 73: | Line 73: | ||
|3 | |3 | ||
|[[IS:UC:MaintenancePlanning|Maintenance Planning]] | |[[IS:UC:MaintenancePlanning|Maintenance Planning]] | ||
|Wartungsplanung | |{{Deu|Wartungsplanung}} | ||
| | | | ||
|MAPL | |MAPL | ||
Line 81: | Line 81: | ||
|3 | |3 | ||
|[[IS:UC:PassengerInformationSystem|Passenger Information System]] | |[[IS:UC:PassengerInformationSystem|Passenger Information System]] | ||
|Fahrgastinformationssystem | |{{Deu|Fahrgastinformationssystem}} | ||
| | | | ||
|PISY | |PISY | ||
Line 89: | Line 89: | ||
|3 | |3 | ||
|[[IS:UC:CapacityPlanning|Capacity Planning]] | |[[IS:UC:CapacityPlanning|Capacity Planning]] | ||
|Kapazitätsplanung | |{{Deu|Kapazitätsplanung}} | ||
| | | | ||
|CAPL | |CAPL | ||
| | |JBV/BaneNOR | ||
|draft | |draft | ||
|- | |- | ||
|3 | |3 | ||
|[[IS:UC:NREReporting|NRE Reporting]] | |[[IS:UC:NREReporting|NRE Reporting]] | ||
|NRE Meldung | |{{Deu|NRE Meldung}} | ||
| | | | ||
|NRER | |NRER | ||
|ÖBB | |ÖBB-Infrastruktur | ||
|draft | |draft | ||
|- | |- | ||
|3 | |3 | ||
|[[IS:UC:Speeddirectory|Speed directory]] | |[[IS:UC:Speeddirectory|Speed directory]] | ||
|Verzeichnis der zulässigen Geschwindigkeiten | |{{Deu|Verzeichnis der zulässigen Geschwindigkeiten}} | ||
| | | | ||
|SPED | |SPED | ||
|ÖBB | |ÖBB-Infrastruktur | ||
|draft | |draft | ||
|- | |- | ||
|3 | |3 | ||
|[[IS:UC:Timetabling|Timetabling]] | |[[IS:UC:Timetabling|Timetabling]] | ||
|Fahrplanerstellung | |{{Deu|Fahrplanerstellung}} | ||
| | | | ||
|ISTT | |ISTT | ||
Line 121: | Line 121: | ||
|3 | |3 | ||
|[[IS:UC:CADForRailwaySignaling|CAD for railway signaling]] | |[[IS:UC:CADForRailwaySignaling|CAD for railway signaling]] | ||
|CAD für Zugsignalisierung | |{{Deu|CAD für Zugsignalisierung}} | ||
| | | | ||
|CASP | |CASP | ||
Line 129: | Line 129: | ||
|3 | |3 | ||
|[[IS:UC:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]] | |[[IS:UC:CaptureSchematicVisualisationInformationOfTrackAssets|Capture schematic visualisation information of track assets]] | ||
|Erstellung schematischer Visualisierungsinformationen von Schienenanlagen | |{{Deu|Erstellung schematischer Visualisierungsinformationen von Schienenanlagen}} | ||
| | | | ||
| | | | ||
Line 137: | Line 137: | ||
|3 | |3 | ||
|[[IS:UC:RailwayInfrastructureVisualisation|Railway Infrastructure Visualisation]] | |[[IS:UC:RailwayInfrastructureVisualisation|Railway Infrastructure Visualisation]] | ||
|Visualisierung von Schieneninfrastruktur | |{{Deu|Visualisierung von Schieneninfrastruktur}} | ||
| | | | ||
|ISVI | |ISVI | ||
Line 145: | Line 145: | ||
|3 | |3 | ||
|[[IS:UC:Railway Simulation Laboratory|Railway Simulation Laboratory]] | |[[IS:UC:Railway Simulation Laboratory|Railway Simulation Laboratory]] | ||
|Eisenbahnbetriebslabor | |{{Deu|Eisenbahnbetriebslabor}} | ||
| | | | ||
|RLAB | |RLAB |
Revision as of 17:17, 26 January 2017
| ||||||||
|
This page provides use cases specific to the IS-subschema. See Dev:Use cases to learn what is a use case, how to contribute to writing good railML®-Use Cases and where to find them in this wiki.
List of Use Cases
The following list provides links to the use cases for the exchange of data between applications related with railway infrastructure:
Priority | Description (EN) | Description (DE) | Description (FR) | Abbreviation | Reported by | Status |
---|---|---|---|---|---|---|
1 | Schematic Track Plan | Schematische Gleisplandarstellung | SCTP | JBV/BaneNOR | ongoing | |
1 | RINF Reporting | RINF Meldung | RINR | SNCF Réseau | ongoing | |
1 | Network statement of an infrastructure manager | Schienennetzbenutzungsbedingungen eines Infrastrukturbetreibers | NEST | ongoing | ||
2 | Positioning and Map-Matching | Positionierung und Kartenvergleich | POSI | draft | ||
2 | Asset status representation | Darstellung des Infrastrukturzustands | ASSR | DLR for IN2Rail project | draft | |
3 | Railway Infrastructure Recording | Erfassung der Schieneninfrastruktur | ISRC | Bahnkonzept | draft | |
3 | Exchange of planning parameters for interlocking with suppliers | Austausch von Planungsparametern für Stellwerke mit Herstellern | ISIL | draft | ||
3 | Driver Advisory System (DAS) | Fahrerassistenzsystem | DASY | draft | ||
3 | Maintenance Planning | Wartungsplanung | MAPL | draft | ||
3 | Passenger Information System | Fahrgastinformationssystem | PISY | draft | ||
3 | Capacity Planning | Kapazitätsplanung | CAPL | JBV/BaneNOR | draft | |
3 | NRE Reporting | NRE Meldung | NRER | ÖBB-Infrastruktur | draft | |
3 | Speed directory | Verzeichnis der zulässigen Geschwindigkeiten | SPED | ÖBB-Infrastruktur | draft | |
3 | Timetabling | Fahrplanerstellung | ISTT | ProRail | draft | |
3 | CAD for railway signaling | CAD für Zugsignalisierung | CASP | RailComplete | draft | |
3 | Capture schematic visualisation information of track assets | Erstellung schematischer Visualisierungsinformationen von Schienenanlagen | draft | |||
3 | Railway Infrastructure Visualisation | Visualisierung von Schieneninfrastruktur | ISVI | Veraltet | ||
3 | Railway Simulation Laboratory | Eisenbahnbetriebslabor | RLAB | ČVUT | draft |