UC:IS:Schematic Track Plan

From railML 2 Wiki
Revision as of 17:00, 25 September 2016 by RailML Coord Documentation (talk | contribs) (New article)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Schematic Trac Plan
Subschema: Infrastructure
 
Related subschemas: IL TT RS 
Reported by: Jernbaneverket
Stift.png (version(s) 3)
For general information on use cases see UC:Use cases


Use case / Anwendungsfall

Schematic Trac Plan

Description / Beschreibung

Jernbaneverket (JBV) uses maps for visualization of their railway infrastructure. In particular, JBV needs to display:* Geographic maps

  • Geoschematic maps/drawings
    • Operational points with geodetic coordinates
    • In between: schematic interpolation
  • Schematic drawings
    • All elements have screen coordinates

An example for a schematic drawing:

Sctp1.png

A more complex example from the real world:

Sctp2b.png

Data Flows and Interfaces / Datenflüsse und Schnittstellen

Missinginformation.png In this article there is information missing. Please help improving the railML® wiki by filling the gaps. Possibly, you will find further details on the discussion pageFerri Leberl (talk) 17:00, 25 September 2016 (CEST)

Interference with other railML® schemas / Interferenz mit anderen railML®-Schemen

  • TT
  • IL
  • IS

This interference to interlocking relates to the visualization of routes and their attributes (ATP device type, CTC handling, overlap/safety zone/slip, timers, speeds), which is demanded by JBV.

Characterizing Data / Charakterisierung der Daten

How often do the data change (update)?

Missinginformation.png In this article there is information missing. Please help improving the railML® wiki by filling the gaps. Possibly, you will find further details on the discussion pageFerri Leberl (talk) 17:00, 25 September 2016 (CEST)

How big are the data fragments to be exchanged (complexity)?

Missinginformation.png In this article there is information missing. Please help improving the railML® wiki by filling the gaps. Possibly, you will find further details on the discussion pageFerri Leberl (talk) 17:00, 25 September 2016 (CEST)

Which views are represented by the data (focus)?

Missinginformation.png In this article there is information missing. Please help improving the railML® wiki by filling the gaps. Possibly, you will find further details on the discussion pageFerri Leberl (talk) 17:00, 25 September 2016 (CEST)

Which specific data do you expect to receive/send (elements)?

Element Attribute Typical value Range
Line Name, code/abbreviation Bergensbanen, BB Text
Tracks (only main track for macroscopic view) Number/name, type (main/left main/right main/route track, other station track, siding, buffer/dead end track), track owner 1,2A,3P 1-99; +letters A-Z
Speed (for multiple speed profiles) Profile1 (normal), profile2 (plus) profile3 (tilt) 40,50,70 0-300 (in 5 km/h steps, 300 km/h can be extended in future)
Gradients Gradient 2 ‰ 0-55‰ today, 0-35‰ for new lines, operational only integers, line planning usually only one decimal
Millage change (Discontinuations) Milage change, direction change +300 meters, -20 meters  
OCP, Timing point of Operational Control Point (OCP) (aka. Station vertex, station cross section) CrossSection, Ocp name, OCP type, border to uncontrolled area, local areas, work areas 45,153 Kilometration, Oslo S Kilometration to the meter
Signals Name,Aspects,Type,    
Clearances (ClearanceGaugeChange)   35,123 Km Kilometration to the meter
Switches Name (number+letter), Km, main track: left/right/(straight), deflecting track: left/right, normal position: left/right, gradient 1,201a, 35,123 , 1:12  
Tunnels Name, cross section, contour (rock (rough)/concrete (smooth)), Km from , Km to Trollunga, 45m², rock
Level crossings Name, km Jeløygate, 34,123 Km  
Train detection element (Track circuit border / train detector (axle counter)) Name, km 301, 34,123 Km  
Stop markers Valid for train length, Km 220m, 34,123 Km  
Platforms Name/Number, km from, km to, effective km from , effective km to    
Bridges Name, Km from, Km to    
Derailers Name, derailing side, Km    
Underpasses Name, used for track numbers, Km    
Signal locks(separate or under signal type?) Name/Number, lock type, Km S1, C, 34,123 Lock type: A-E