UC:IL:UseCases: Difference between revisions
Jump to navigation
Jump to search
[checked revision] | [checked revision] |
(→List of Use Cases for Interlocking: Redirects expanded) |
(Order Rename ''IS:UC:...'' to ''IL:UC:...'' removed) |
||
Line 1: | Line 1: | ||
{{navi}} | {{navi}} | ||
This page provides use cases specific to the [[interlocking|IL-subschema]]. See [[Dev:Use cases]] to learn what is a use case, how to contribute to writing good {{rml}}-Use Cases and where to find them in this wiki. | This page provides use cases specific to the [[interlocking|IL-subschema]]. See [[Dev:Use cases]] to learn what is a use case, how to contribute to writing good {{rml}}-Use Cases and where to find them in this wiki. | ||
{{Under construction|date=2016-06-30|topic=Merge similar use cases | {{Under construction|date=2016-06-30|topic=Merge similar use cases|user=[[Benutzer:Coordination|Coordination]] ([[Benutzer Diskussion:Coordination|Diskussion]]) 22:15, 30. Jun. 2016 (CEST)}} | ||
== List of Use Cases for Interlocking == | == List of Use Cases for Interlocking == |
Revision as of 20:44, 29 August 2016
| ||||||||
|
This page provides use cases specific to the IL-subschema. See Dev:Use cases to learn what is a use case, how to contribute to writing good railML®-Use Cases and where to find them in this wiki.
|
List of Use Cases for Interlocking
The following list provides links to the use cases related with interlocking:
- Operation and Control; Betriebsführung
- Simulation; Simulation
- Interlocking engineering; Stellwerksprojektierung;
- Interlocking engineering for signalling; Stellwerkstechnik für Signalisierung (reported by Jernbaneverket, Norway)
- Data prepration for interlocking; Datenbereitstellung für Stellwerkssysteme (reported by EULYNX project)
- Hardware and cable plan; Aussenanlage und Kabelplan
- Site preparation data for Signal Controlled Warning Systems (SCWS); Daten zur Standortvorbereitung für Rottenwarnsysteme