UC:IL:HardwareAndCablePlan

From railML 2 Wiki
Revision as of 12:50, 16 October 2015 by RailML Orga Governance (talk | contribs) (insert of content)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Use case / Anwendungsfall / :

Hardware and cable plan; Hardware und Kabelplan;


Description / Beschreibung /

  • Cable plan
  • Parts Lists
  • Number of field element controller
  • Hardware indoor, outdoor (number of point machines, number of axle counters, number of signals, …)
  • Network components (router, switches, cable)
  • Power supply
  • Technical room, number of CPU boards, Container


Data Flows and Interfaces / Datenflüsse und Schnittstellen /

Information Category:

  • Topology (origin: railML IS schema or classic track plan)
  • Cable plan (origin: railML IS schema or classic track plan)


Interference with other railML® schemas / Interferenz mit anderen railML®-Schemen /

  • infrastructure


Characterizing Data / Charakterisierung der Daten /

This section serves to specify the required data regarding certain aspects.

How often do the data change (update)?

  • static (not changing) on demand

How big are the data fragments to be exchanged (complexity)?

  • big (station/yard)

Which views are represented by the data (focus)?

  • Energy
  • Construction

Which specific timetable data do you expect to receive/send (elements)?

  • Number of elements (signals, distant signals, repeater, supplementary signals, point machines, Track vacancy detection ( axle counter)…..)
  • Position of elements
  • Block interface to foreign IXL
  • Level crossing
  • Tunnel gates
  • Bascule bridges
  • Slide detector