Talk:UC:IL:UseCases

From railML 2 Wiki
Jump to navigation Jump to search

Prioritization and Communication of IL uses cases

I propose to edit the use cases sorted as validated priorities That is (to be discussed and approbed before publishing): (below a trial as chart, and further below the original text version enriched

Priority Description (EN) Description (DE) Description (FR) Status
1 Data prepration for interlocking Datenbereitstellung für Stellwerkssysteme [[IL:UC:EulynxDataPreparationInterlocking|]] ongoing
2 Interlocking engineering for signalling Stellwerkstechnik für Signalisierung [[IL:UC:InterlockEngineeringForSignallingWithinJBV|]] tbc
3 Interlocking engineering Stellwerksprojektierung [[IL:UC:InterlockingEngineering|]] tbc
4 Example Example Example Example
5 Example Example Example Example
6 Example Example Example Example
tbd Example Example Example Example
tbd Example Example Example Example
tbd Example Example Example Example
tbd Example Example Example Example

I propose to edit the use cases sorted as validated priorities

That is (to be discussed and approbed before publishing):

The following list provides links to the use cases related with interlocking:

--Alain Jeanmaire (talk) 12:57, 29 August 2016 (CEST)

I suggest to add a column with the reporter of the use case (EULYNX, Jernbaneverket, ...) and a column with the status of the use case (draft, discussed, consolidated, implemented, revised, ...).
--Vasco Paul Kolmorgen (talk) 21:37, 29 August 2016 (CEST)