Talk:UC:IL:UseCases
Jump to navigation
Jump to search
Prioritization and Communication of IL uses cases
I propose to edit the use cases sorted as validated priorities
That is (to be discussed and approbed before publishing): (below a trial as chart, and further below the original text version enriched
Priority | Description (EN) | Description (DE) | Description (FR) | Status |
---|---|---|---|---|
1 | Data prepration for interlocking | Datenbereitstellung für Stellwerkssysteme | [[IL:UC:EulynxDataPreparationInterlocking|]] | ongoing |
2 | Interlocking engineering for signalling | Stellwerkstechnik für Signalisierung | [[IL:UC:InterlockEngineeringForSignallingWithinJBV|]] | tbc |
3 | Interlocking engineering | Stellwerksprojektierung | [[IL:UC:InterlockingEngineering|]] | tbc |
4 | Example | Example | Example | Example |
5 | Example | Example | Example | Example |
6 | Example | Example | Example | Example |
tbd | Example | Example | Example | Example |
tbd | Example | Example | Example | Example |
tbd | Example | Example | Example | Example |
tbd | Example | Example | Example | Example |
I propose to edit the use cases sorted as validated priorities
That is (to be discussed and approbed before publishing):
The following list provides links to the use cases related with interlocking:
- Data prepration for interlocking; Datenbereitstellung für Stellwerkssysteme (reported by EULYNX project)
- Interlocking engineering for signalling; Stellwerkstechnik für Signalisierung (reported by Jernbaneverket, Norway)
- Interlocking engineering; Stellwerksprojektierung;
- Simulation; Simulation
- Operation and Control; Betriebsführung
- Hardware and cable plan; Aussenanlage und Kabelplan
- Site preparation data for Signal Controlled Warning Systems (SCWS); Daten zur Standortvorbereitung für Rottenwarnsysteme
--Alain Jeanmaire (talk) 12:57, 29 August 2016 (CEST)