Talk:UC:IL:UseCases: Difference between revisions
Jump to navigation
Jump to search
(Section header, signature and links added) |
(→Prioritization and Communication of IL uses cases: Sugesstion for expanding the table) |
||
Line 1: | Line 1: | ||
== Prioritization and Communication of IL uses cases == | == Prioritization and Communication of IL uses cases == | ||
I propose to edit the use cases sorted as validated priorities | I propose to edit the use cases sorted as validated priorities | ||
That is (to be discussed and approbed before publishing): (below a trial as chart, and further below the original text version enriched | That is (to be discussed and approbed before publishing): (below a trial as chart, and further below the original text version enriched | ||
{| class="wikitable" | {| class="wikitable" | ||
Line 45: | Line 42: | ||
* [[tbd- IL:UC:SitePreparationDataForSignalControlledWarningSystems |Site preparation data for Signal Controlled Warning Systems (SCWS); {{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}]] | * [[tbd- IL:UC:SitePreparationDataForSignalControlledWarningSystems |Site preparation data for Signal Controlled Warning Systems (SCWS); {{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}]] | ||
--[[User:Alain Jeanmaire|Alain Jeanmaire]] ([[User talk:Alain Jeanmaire|talk]]) 12:57, 29 August 2016 (CEST) | --[[User:Alain Jeanmaire|Alain Jeanmaire]] ([[User talk:Alain Jeanmaire|talk]]) 12:57, 29 August 2016 (CEST) | ||
: I suggest to add a column with the reporter of the use case (EULYNX, Jernbaneverket, ...) and a column with the status of the use case (draft, discussed, consolidated, implemented, revised, ...). | |||
: --[[User:Vasco Paul Kolmorgen|Vasco Paul Kolmorgen]] ([[User talk:Vasco Paul Kolmorgen|talk]]) 21:37, 29 August 2016 (CEST) |
Revision as of 21:37, 29 August 2016
Prioritization and Communication of IL uses cases
I propose to edit the use cases sorted as validated priorities That is (to be discussed and approbed before publishing): (below a trial as chart, and further below the original text version enriched
Priority | Description (EN) | Description (DE) | Description (FR) | Status |
---|---|---|---|---|
1 | Data prepration for interlocking | Datenbereitstellung für Stellwerkssysteme | [[IL:UC:EulynxDataPreparationInterlocking|]] | ongoing |
2 | Interlocking engineering for signalling | Stellwerkstechnik für Signalisierung | [[IL:UC:InterlockEngineeringForSignallingWithinJBV|]] | tbc |
3 | Interlocking engineering | Stellwerksprojektierung | [[IL:UC:InterlockingEngineering|]] | tbc |
4 | Example | Example | Example | Example |
5 | Example | Example | Example | Example |
6 | Example | Example | Example | Example |
tbd | Example | Example | Example | Example |
tbd | Example | Example | Example | Example |
tbd | Example | Example | Example | Example |
tbd | Example | Example | Example | Example |
I propose to edit the use cases sorted as validated priorities
That is (to be discussed and approbed before publishing):
The following list provides links to the use cases related with interlocking:
- Data prepration for interlocking; Datenbereitstellung für Stellwerkssysteme (reported by EULYNX project)
- Interlocking engineering for signalling; Stellwerkstechnik für Signalisierung (reported by Jernbaneverket, Norway)
- Interlocking engineering; Stellwerksprojektierung;
- Simulation; Simulation
- Operation and Control; Betriebsführung
- Hardware and cable plan; Aussenanlage und Kabelplan
- Site preparation data for Signal Controlled Warning Systems (SCWS); Daten zur Standortvorbereitung für Rottenwarnsysteme
--Alain Jeanmaire (talk) 12:57, 29 August 2016 (CEST)
- I suggest to add a column with the reporter of the use case (EULYNX, Jernbaneverket, ...) and a column with the status of the use case (draft, discussed, consolidated, implemented, revised, ...).
- --Vasco Paul Kolmorgen (talk) 21:37, 29 August 2016 (CEST)