Talk:UC:IL:UseCases: Difference between revisions
Jump to navigation
Jump to search
(proposal for sorting use cases as priorized) |
(Section header, signature and links added) |
||
Line 1: | Line 1: | ||
== Prioritization and Communication of IL uses cases == | |||
I propose to edit the use cases sorted as validated priorities | I propose to edit the use cases sorted as validated priorities | ||
Line 6: | Line 8: | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
! Priority !! Description (EN) !! Description ( | ! Priority !! Description (EN) !! Description (DE) !! Description (FR) !! Status | ||
|- | |- | ||
| 1 || IL:UC:EulynxDataPreparationInterlocking|Data prepration for interlocking || {{Deu|Datenbereitstellung für Stellwerkssysteme}} || Préparation des données signalisation || | | 1 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for interlocking]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Fra|Préparation des données signalisation}}]] || ongoing | ||
|- | |- | ||
| 2 || IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling || {{Deu|Stellwerkstechnik für Signalisierung}} || | | 2 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Fra|Exemple}}]] || tbc | ||
|- | |- | ||
| 3 || IL:UC:InterlockingEngineering |Interlocking engineering || {{Deu|Stellwerksprojektierung}} || {{Fra|Invariants des système d’enclenchement}} || tbc | | 3 || [[IL:UC:InterlockingEngineering|Interlocking engineering]] || [[IL:UC:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || [[IL:UC:InterlockingEngineering|{{Fra|Invariants des système d’enclenchement}}]] || tbc | ||
|- | |- | ||
| 4 || Example || Example || Example || Example | | 4 || Example || Example || Example || Example | ||
Line 42: | Line 44: | ||
* [[tbd- IL:UC:HardwareAndCablePlan |Hardware and cable plan; {{Deu|Aussenanlage und Kabelplan}}]] | * [[tbd- IL:UC:HardwareAndCablePlan |Hardware and cable plan; {{Deu|Aussenanlage und Kabelplan}}]] | ||
* [[tbd- IL:UC:SitePreparationDataForSignalControlledWarningSystems |Site preparation data for Signal Controlled Warning Systems (SCWS); {{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}]] | * [[tbd- IL:UC:SitePreparationDataForSignalControlledWarningSystems |Site preparation data for Signal Controlled Warning Systems (SCWS); {{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}]] | ||
--[[User:Alain Jeanmaire|Alain Jeanmaire]] ([[User talk:Alain Jeanmaire|talk]]) 12:57, 29 August 2016 (CEST) |
Revision as of 21:28, 29 August 2016
Prioritization and Communication of IL uses cases
I propose to edit the use cases sorted as validated priorities
That is (to be discussed and approbed before publishing): (below a trial as chart, and further below the original text version enriched
Priority | Description (EN) | Description (DE) | Description (FR) | Status |
---|---|---|---|---|
1 | Data prepration for interlocking | Datenbereitstellung für Stellwerkssysteme | [[IL:UC:EulynxDataPreparationInterlocking|]] | ongoing |
2 | Interlocking engineering for signalling | Stellwerkstechnik für Signalisierung | [[IL:UC:InterlockEngineeringForSignallingWithinJBV|]] | tbc |
3 | Interlocking engineering | Stellwerksprojektierung | [[IL:UC:InterlockingEngineering|]] | tbc |
4 | Example | Example | Example | Example |
5 | Example | Example | Example | Example |
6 | Example | Example | Example | Example |
tbd | Example | Example | Example | Example |
tbd | Example | Example | Example | Example |
tbd | Example | Example | Example | Example |
tbd | Example | Example | Example | Example |
I propose to edit the use cases sorted as validated priorities
That is (to be discussed and approbed before publishing):
The following list provides links to the use cases related with interlocking:
- Data prepration for interlocking; Datenbereitstellung für Stellwerkssysteme (reported by EULYNX project)
- Interlocking engineering for signalling; Stellwerkstechnik für Signalisierung (reported by Jernbaneverket, Norway)
- Interlocking engineering; Stellwerksprojektierung;
- Simulation; Simulation
- Operation and Control; Betriebsführung
- Hardware and cable plan; Aussenanlage und Kabelplan
- Site preparation data for Signal Controlled Warning Systems (SCWS); Daten zur Standortvorbereitung für Rottenwarnsysteme
--Alain Jeanmaire (talk) 12:57, 29 August 2016 (CEST)