Talk:UC:IL:UseCases: Difference between revisions
Jump to navigation
Jump to search
m (Ferri Leberl moved page Talk:IL:UseCases to Talk:UC:IL:UseCases: Vereinheitlichung) |
(-fra) |
||
Line 5: | Line 5: | ||
{| class="wikitable" | {| class="wikitable" | ||
|- | |- | ||
! Priority !! Description (EN) !! Description (DE | ! Priority !! Description (EN) !! Description (DE) !! Status | ||
|- | |- | ||
| 1 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for interlocking]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme | | 1 || [[IL:UC:EulynxDataPreparationInterlocking|Data prepration for interlocking]] || [[IL:UC:EulynxDataPreparationInterlocking|{{Deu|Datenbereitstellung für Stellwerkssysteme}}]] || ongoing | ||
|- | |- | ||
| 2 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung | | 2 || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling]] || [[IL:UC:InterlockEngineeringForSignallingWithinJBV|{{Deu|Stellwerkstechnik für Signalisierung}}]] || tbc | ||
|- | |- | ||
| 3 || [[IL:UC:InterlockingEngineering|Interlocking engineering]] || [[IL:UC:InterlockingEngineering|{{Deu|Stellwerksprojektierung | | 3 || [[IL:UC:InterlockingEngineering|Interlocking engineering]] || [[IL:UC:InterlockingEngineering|{{Deu|Stellwerksprojektierung}}]] || tbc | ||
|- | |- | ||
| 4 | | 4 || Example || Example || Example | ||
|- | |- | ||
| 5 | | 5 || Example || Example || Example | ||
|- | |- | ||
| 6 | | 6 || Example || Example || Example | ||
|- | |- | ||
| tbd | | tbd || Example || Example || Example | ||
|- | |- | ||
| tbd | | tbd || Example || Example || Example | ||
|- | |- | ||
| tbd | | tbd || Example || Example || Example | ||
|- | |- | ||
| tbd | | tbd || Example || Example || Example | ||
|} | |} | ||
I propose to edit the use cases sorted as validated priorities | I propose to edit the use cases sorted as validated priorities | ||
Line 35: | Line 35: | ||
* [[1- IL:UC:EulynxDataPreparationInterlocking|Data prepration for interlocking; {{Deu|Datenbereitstellung für Stellwerkssysteme}}]] ''(reported by EULYNX project)'' | * [[1- IL:UC:EulynxDataPreparationInterlocking|Data prepration for interlocking; {{Deu|Datenbereitstellung für Stellwerkssysteme}}]] ''(reported by EULYNX project)'' | ||
* [[2- IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling; {{Deu|Stellwerkstechnik für Signalisierung}}]] ''(reported by Jernbaneverket, Norway)'' | * [[2- IL:UC:InterlockEngineeringForSignallingWithinJBV|Interlocking engineering for signalling; {{Deu|Stellwerkstechnik für Signalisierung}}]] ''(reported by Jernbaneverket, Norway)'' | ||
* [[3- IL:UC:InterlockingEngineering |Interlocking engineering; {{Deu|Stellwerksprojektierung | * [[3- IL:UC:InterlockingEngineering |Interlocking engineering; {{Deu|Stellwerksprojektierung}}]] | ||
* [[4- IL:UC:Simulation |Simulation; {{Deu|Simulation}}]] | * [[4- IL:UC:Simulation |Simulation; {{Deu|Simulation}}]] | ||
Latest revision as of 13:05, 13 March 2023
Prioritization and Communication of IL uses cases
I propose to edit the use cases sorted as validated priorities That is (to be discussed and approbed before publishing): (below a trial as chart, and further below the original text version enriched
Priority | Description (EN) | Description (DE) | Status |
---|---|---|---|
1 | Data prepration for interlocking | Datenbereitstellung für Stellwerkssysteme | ongoing |
2 | Interlocking engineering for signalling | Stellwerkstechnik für Signalisierung | tbc |
3 | Interlocking engineering | Stellwerksprojektierung | tbc |
4 | Example | Example | Example |
5 | Example | Example | Example |
6 | Example | Example | Example |
tbd | Example | Example | Example |
tbd | Example | Example | Example |
tbd | Example | Example | Example |
tbd | Example | Example | Example |
I propose to edit the use cases sorted as validated priorities
That is (to be discussed and approbed before publishing):
The following list provides links to the use cases related with interlocking:
- Data prepration for interlocking; Datenbereitstellung für Stellwerkssysteme (reported by EULYNX project)
- Interlocking engineering for signalling; Stellwerkstechnik für Signalisierung (reported by Jernbaneverket, Norway)
- Interlocking engineering; Stellwerksprojektierung
- Simulation; Simulation
- Operation and Control; Betriebsführung
- Hardware and cable plan; Aussenanlage und Kabelplan
- Site preparation data for Signal Controlled Warning Systems (SCWS); Daten zur Standortvorbereitung für Rottenwarnsysteme
--Alain Jeanmaire (talk) 12:57, 29 August 2016 (CEST)
- I suggest to add a column with the reporter of the use case (EULYNX, Jernbaneverket, ...) and a column with the status of the use case (draft, discussed, consolidated, implemented, revised, ...). --Vasco Paul Kolmorgen (talk) 21:37, 29 August 2016 (CEST)
- Agreed during the IL developers conference call that this table shall be extended with an abbreviation column and used from now for priorisation and status follow up. --Coordination (talk) 15:12, 6 September 2016 (CEST)
- I am going to make this list. As to avoid misunderstandings, I would like to ask you for some clarifications.
- Did I understand you properly, that this change relates to the list of use cases — or does it affect the use case articles themselves? (e.g.: should the abbreviation and the status be integrated into the individual use case articles?)
- Which kind of prioritization will be implemented? I'll have to explain the criterion to the readers of the page ...
- Thank you in advance for your answers.
I would appreciate your participation in the discussion on the documentation of railML®3, as the decisions made in this matter will affect all of us — see here (link to the railML® website).
Yours, Ferri Leberl (talk) 17:23, 8 September 2016 (CEST)
- I am going to make this list. As to avoid misunderstandings, I would like to ask you for some clarifications.
- Agreed during the IL developers conference call that this table shall be extended with an abbreviation column and used from now for priorisation and status follow up. --Coordination (talk) 15:12, 6 September 2016 (CEST)