TT:operatingPeriodRef trainPart

From railML 2 Wiki
Revision as of 11:46, 18 June 2018 by RailML Coord Documentation (talk | contribs) ({{StartEndDoc}})
Jump to navigation Jump to search


operatingPeriodRef
 


Scheme description / Schemenbeschreibung

Position of operatingPeriodRef in the XML-Tree / Position von operatingPeriodRef im XML-Baum

Multiplicity / Anzahl

[1..1]

Semantics / Bedeutung

The Element <operatingPeriodRef> is used for referencing the operatingPeriod for the trainPart.

Das Element <operatingPeriodRef> referenziert die zum trainPart gehörige Verkehrsperiode.

Attributes of operatingPeriodRef / Attribute von operatingPeriodRef

  • ref: This refers to the id attribute of the associated <operatingPeriod> element.

Syntactic Constraints / Syntaktische Beschränkungen

  • ref xs:IDREF, mandatory
  • startDate xs:date, optional (deprecated with version 2.2); shall be lower or equal endDate if both are used.
  • endDate xs:date, optional (deprecated with version 2.2); shall be higher or equal startDate if both are used.

Best practice & Examples / Empfohlene Anwendung & Beispiele

Normal reference to the operatingPeriod for 'daily':

<rail:operatingPeriodRef ref="TGL"/>
  • See also
  1. How to indicate midnight overruns in railML
  • iRFP Dresden: selection of examples for operationg periods in German
  1. iRFP-Informationen und -Beispiel zu Verkehrstagen in railML (external link, May 2012, 🇩🇪; by Dirk Bräuer, iRFP Dresden)

Notes / Anmerkungen

Child element specialService is deprecated from railML 2.2 on. An individual operatingPeriod for each trainPart should be referenced instead. See TRAC ticket #158.

Open issues / Offene Punkte/Pendenzen

Not yet described. / Noch nicht beschrieben.