TT:operatingPeriodRef replacementOf
Revision as of 13:11, 10 August 2020 by RailML Coord Common (talk | contribs) (Corrected syntactic info: no children, added missing startDate and endDate.)
Scheme description / Schemenbeschreibung / Description du schéma
Position of <operatingPeriodRef> in the XML-Tree / Position von <operatingPeriodRef> im XML-Baum / position de <operatingPeriodRef> dans l’aborescence XML
- Parent: <replacementOf> (introduced with version 2.4)
- Children: None
Multiplicity / Anzahl / Multiplicité
Semantics / Bedeutung / Sémantique
(introduced with version 2.4) Specifies the operating days of a replacement
(introduced with version 2.4) Spezifiziert die Betriebstage eines Ersatzes
Attributes of <operatingPeriodRef> / Attribute von <operatingPeriodRef> / Attributs de <operatingPeriodRef>
- ref: This refers to the id attribute of the associated <operatingPeriod> element.
- xs:anyAttribute: This provides an extension point for non-railML attributes in a foreign namespace. How to use it?
- startDate (deprecated with version 2.2): This describes optional further restrictions of the operating period. Please, recognize the semantic constraint.
- endDate (deprecated with version 2.2): This describes optional further restrictions of the operating period. Please, recognize the semantic constraint.
Syntactic Constraints / Syntaktische Beschränkungen / Contraintes syntactiques
- ref xs:IDREF, mandatory
- startDate xs:date, optional (deprecated with version 2.2); shall be lower or equal endDate if both are used.
- endDate xs:date, optional (deprecated with version 2.2); shall be higher or equal startDate if both are used.
Best practice & Examples / Empfohlene Anwendung & Beispiele / Bonnes pratiques & exemples
Not yet described. / Noch nicht beschrieben. / Pas encore décrit.
Notes / Anmerkungen / Notes
Not yet described. / Noch nicht beschrieben. / Pas encore décrit.
Open issues / Offene Punkte/Pendenzen / Questions ouvertes
Not yet described. / Noch nicht beschrieben. / Pas encore décrit.