Search results
Jump to navigation
Jump to search
- UC:IS:RailwayInfrastructureVisualisation (section Interference with other railML® schemas / Interferenz mit anderen railML®-Schemen)The resulting changes to the planned infrastructure shall be fed back into a visualization software. The infrastructure data to be modified contains railway10 bytes (180 words) - 16:12, 3 February 2020
- IS:electrificationChange (category Infrastructure Elements)Jernbanedirektoratet railML® 2.4 glossary (external link) Description of the FBS railML® interface (external link) [https://wiki3.railml.org railML® 3.1 Tutorial3 KB (1,150 words) - 15:33, 25 March 2024
- between railML® 2.1 and railML® 2.2 This page shows schema differences between railML® 2.1 and railML® 2.2. It is intended to support advanced railML® users331 KB (27,016 words) - 10:56, 8 October 2021
- IS:speedChange (category Infrastructure Elements)etcsTrainCategory: (introduced with version 2.2)(deprecated with version 2.5) in railML® 2.2 to railML® 2.4: the international train category number as specified on page10 KB (1,890 words) - 15:25, 25 March 2024
- IS:gaugeChange (category Infrastructure Elements)millimeter); default: 1435; optional Consider railML® 2.2 example of East Saxony railway network by FBS (link to the railML® website). This code example defines2 KB (728 words) - 15:34, 25 March 2024
- IS:balise (category Infrastructure Elements)org/wiki/Balise (external link) railML® forum post (link to the railML® website) Llorente González, Diego. "Application of railML® modelling to ERTMS-ETML."3 KB (936 words) - 19:16, 22 January 2024
- IS:radiusChange (category Infrastructure Elements) (section Modelling of transition curves in railML 2.3)is not an explicit number, railML® uses the value 0 here, which is a virtual value and does not exist in reality. With railML® 2.3 the element <radiusChange>9 KB (1,756 words) - 15:32, 25 March 2024
- IS:switch (category Infrastructure Elements)<any>, <geoCoord>, <states>, <connection>, [0..∞] A <switch> defines a standard railroad switch with three connections as an infrastructure element. A2 KB (1,151 words) - 16:06, 6 November 2022
- IS:stopPost (category Infrastructure Elements)solution is sufficient and the concept of referencing will be revised with railML® version 3.1. verbalConstraints attribute can be used for: - stop posts5 KB (1,258 words) - 17:26, 19 January 2024
- UC:IS:RailwayInfrastructureRecording (section Interference with other railML® schemas / Interferenz mit anderen railML®-Schemen)railway infrastructure data in an economical, fast and accurate way. Information about the track geometry, topology and related infrastructure elements10 bytes (335 words) - 16:12, 3 February 2020
- IS:ownerChange (category Infrastructure Elements)xs:positiveInteger, optional infrastructureManagerRef: xs:IDREF Please see also example (link to the railML® website) for border between infrastructure mangers. Positive2 KB (715 words) - 15:33, 25 March 2024
- IS:tunnel (category Infrastructure Elements)with version 2.1), <any>, <geoCoord>, <states>, <crossedElements> [0..∞] A <tunnel> defines a tunnel as an infrastructure element and its attributes.8 KB (1,348 words) - 17:47, 19 January 2024
- IS:position trackElementVis (category Infrastructure Elements)specified using the <geoCoord> element. (deprecated with version 2.1)(introduced with version 2.4) This Element has been deprecated with railML® 2.1 but reintroduced956 bytes (142 words) - 13:02, 10 May 2023
- IS:powerTransmissionChange (category Infrastructure Elements)followed by at minimum two characters, white space not allowed for extending railML® enumeration lists); default: adhesion; optional style: xs:string; optional1 KB (772 words) - 15:32, 25 March 2024
- between railML® 2.4 and railML® 2.5 This page shows schema differences between railML® 2.4 and railML® 2.5. It is intended to support advanced railML® users398 KB (34,006 words) - 10:54, 8 October 2021
- IS:border (category Infrastructure Elements)to the infrastructure based on a specific project or an area that is relevant for a specific project. Compare forum discussion (link to the railML® website)2 KB (847 words) - 17:36, 4 December 2023
- IS:gradientChange (category Infrastructure Elements)xs:decimal, 6 fraction digits, radius value measured in meter, optional In railML® 2.4nor/in the use in the Norwegian railway sector the <gradientChange>3 KB (931 words) - 18:37, 25 March 2024
- IS:trainRadioChange (category Infrastructure Elements)<additionalName>, <any>, <geoCoord>, <states> [0..∞] Start of section with certain train radio system installed at the infrastructure. id: XML-file-wide unique1 KB (689 words) - 23:47, 14 September 2020
- IS:to state (category Infrastructure Elements)reference to a well-known 'operation or control point' defined in the same railML® file pos: This is the position on a track defined as distance from its840 bytes (130 words) - 17:35, 19 January 2024
- IS:serviceSection (category Infrastructure Elements)bridge, other:[any], optional A car ramp shall be modelled using the existing railML® element <serviceSection> together with boolean attribute @ramp="true".4 KB (1,103 words) - 16:56, 13 March 2022