IS:propOperational

From railML 2 Wiki
Revision as of 21:20, 28 September 2009 by RailML Coord Infrastructure (talk | contribs) (Die Seite wurde neu angelegt: {{elementDocu| elementName = propOperational |parent = {{DocIS|ocp}} |childs = {{DocIS|uptime}} |ownAttributes = * {{attr|operationalType}}: a keyword that defines th...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


propOperational
 


Scheme description / Schemenbeschreibung

Position of propOperational in the XML-Tree / Position von propOperational im XML-Baum

Multiplicity / Anzahl

[1..1]

Semantics / Bedeutung

<propOperational> is a contains attributes which further refine the operational properties of an <ocp>.

Attributes of propOperational / Attribute von propOperational

  • operationalType: a keyword that defines the operational function of this OCP (xs:string, optional); possible values:
    • station: a regular passenger station
    • stoppingPoint: an ocp without tracks where trains start, stop or end e. g. for passenger exchange (German: Haltepunkt)
    • depot: a train depot
    • crossover: a connection between two tracks of a double-track line (German: "Überleitstelle")
    • junction: joining/splitting of two lines (German: "Abzweigstelle")
    • blockPost: an ocp without block signale where the train sequence is monitored (German: "Zuglaufmeldestelle")
    • blockSignal: an ocp consisting of a block signal only (German: "Zugfolgestelle" / "Blockstelle")
    • stoppingPoint: an ocp without tracks where trains start, stop or end e. g. for passenger exchange (German: Haltepunkt)
  • trafficType: a keyword that defines the kind of traffic for this OCP (xs:string, optional); possible values:
    • passenger: the prevailing traffic occuring at this OCP is passenger traffic
    • freight: the prevailing traffic occuring at this OCP is freight traffic
    • shunting: the prevailing traffic occuring at this OCP is shunting traffic, e. g. in a depot or a workshop
  • orderChangeable: if true, the OCP is capable of changing the train sequence on the open track. That means that the OCP has at least one point. (xs:boolean, optional)
  • ensuresTrainSequence: if true, the OCP ensures and protects the train sequence on the open track. In other words: while the OCP is occupied by a train, a subsequent train may safely approach the OCP. The train sequence is protected. This is mostly implemented by a signal (e. g. a home signal or a block signal). (xs:boolean, optional)

Syntactic Constraints / Syntaktische Beschränkungen

Not yet described. / Noch nicht beschrieben.

Best practice & Examples / Empfohlene Anwendung & Beispiele

Not yet described. / Noch nicht beschrieben.

Notes / Anmerkungen

Open issues / Offene Punkte/Pendenzen

Not yet described. / Noch nicht beschrieben.