UC:IL:UseCases: Difference between revisions
Jump to navigation
Jump to search
[checked revision] | [checked revision] |
m (→Use Cases for "Interlocking": Small test) |
m (→List of Use Cases for Interlocking: JBV changed to Jernbaneverket (Norway)) |
||
Line 9: | Line 9: | ||
* [[IS:UC:InterlockingEngineering |Interlocking engineering; {{Deu|Stellwerksprojektierung}}; {{Fra|Invariants des système d’enclenchement}}]] | * [[IS:UC:InterlockingEngineering |Interlocking engineering; {{Deu|Stellwerksprojektierung}}; {{Fra|Invariants des système d’enclenchement}}]] | ||
* [[IS:UC:SitePreparationDataForSignalControlledWarningSystems |Site preparation data for Signal Controlled Warning Systems (SCWS); {{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}]] | * [[IS:UC:SitePreparationDataForSignalControlledWarningSystems |Site preparation data for Signal Controlled Warning Systems (SCWS); {{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}]] | ||
* [[IS:UC:InterlockEngineeringForSignallingWithinJBV|Interlock engineering for signalling within | * [[IS:UC:InterlockEngineeringForSignallingWithinJBV|Interlock engineering for signalling within Jernbaneverket (Norway); {{Deu|Stellwerkstechnik für Signalisierung innerhalb von Jernbaneverket (Norwegen)}}]] | ||
* [[IS:UC:Simulation |Simulation; {{Deu|Simulation}}]] | * [[IS:UC:Simulation |Simulation; {{Deu|Simulation}}]] |
Revision as of 12:50, 1 February 2016
Use Cases for "Interlocking"
List of Use Cases for Interlocking
The following list provides links to the use cases related with interlocking:
- Hardware and cable plan; Aussenanlage und Kabelplan
- Operation and Control; Betriebsführung
- Interlocking engineering; Stellwerksprojektierung;
- Site preparation data for Signal Controlled Warning Systems (SCWS); Daten zur Standortvorbereitung für Rottenwarnsysteme
- Interlock engineering for signalling within Jernbaneverket (Norway); Stellwerkstechnik für Signalisierung innerhalb von Jernbaneverket (Norwegen)
- Simulation; Simulation