UC:IL:UseCases: Difference between revisions
Jump to navigation
Jump to search
[unchecked revision] | [unchecked revision] |
(→Use Cases for "Interlocking": Clarification for German tranlsation of usecases) |
mNo edit summary |
||
Line 10: | Line 10: | ||
* [[IS:UC:SitePreparationDataForSignalControlledWarningSystems |Site preparation data for Signal Controlled Warning Systems (SCWS); {{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}]] | * [[IS:UC:SitePreparationDataForSignalControlledWarningSystems |Site preparation data for Signal Controlled Warning Systems (SCWS); {{Deu|Daten zur Standortvorbereitung für Rottenwarnsysteme}}]] | ||
* [[IS:UC:InterlockEngineeringForSignallingWithinJBV|Interlock engineering for signalling within JBV; {{Deu|Stellwerkstechnik für Signalisierung innerhalb von JBV}}]] | * [[IS:UC:InterlockEngineeringForSignallingWithinJBV|Interlock engineering for signalling within JBV; {{Deu|Stellwerkstechnik für Signalisierung innerhalb von JBV}}]] | ||
* [[IS:UC:Simulation |Simulation; {{Deu|Simulation}}]] |
Revision as of 11:21, 29 January 2016
Use Cases for "Interlocking"
List of Use Cases
The following list provides links to the use cases related with interlocking:
- Hardware and cable plan; Aussenanlage und Kabelplan
- Operation and Control; Betriebsführung
- Interlocking engineering; Stellwerksprojektierung;
- Site preparation data for Signal Controlled Warning Systems (SCWS); Daten zur Standortvorbereitung für Rottenwarnsysteme
- Interlock engineering for signalling within JBV; Stellwerkstechnik für Signalisierung innerhalb von JBV
- Simulation; Simulation